Boiler Replacement

SOL #: FA480026Q0057Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4800 633 CONS PKP
LANGLEY AFB, VA, 23665, United States

Place of Performance

GRASSY CREEK, VA

NAICS

Other Engine Equipment Manufacturing (333618)

PSC

Diesel Engines And Components (2815)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
May 19, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The 633d Contracting Squadron, DEPT OF THE AIR FORCE, is soliciting proposals for Boiler Replacement services at Langley AFB, VA. This requirement involves the procurement and installation of new boilers, along with the removal and disposal of existing units, at Facility 1302. This acquisition is a Total Small Business Set-Aside. Proposals are due by 5:00 PM EST on May 19, 2026.

Scope of Work

This opportunity requires the contractor to:

  • Procure and install two Lochinvar 1000 FTX boilers to replace existing Fulton PHW boilers in Facility 1302, Joint Base Langley-Eustis.
  • Remove and dispose of existing boilers in accordance with applicable regulations.
  • Furnish and install new boilers, including all necessary labor, materials, equipment, and connections.
  • Ensure installation complies with manufacturer specifications, local codes, and base requirements.
  • Fully test and commission the new system for proper operation.

Key Requirements

  • Boilers must be Lochinvar FTX 1000, fire-tube type, with a capacity of 1000 BTU's and 98% efficiency, fueled by Natural Gas.
  • Contractor must be a licensed mechanical contractor with at least five years of experience in commercial boiler systems.
  • Technicians must be certified for the specified boiler models.
  • Adherence to Operational Security (OPSEC) and Safety reporting requirements is mandatory.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Evaluation Criteria: Award will be made to the responsible Offeror whose offer is most advantageous to the Government, based on the lowest-priced offer that is technically acceptable.
  • Place of Performance: Facility 1302, 586 Weyland Rd, Langley AFB, VA 23665.

Important Dates

  • Mandatory Site Visit: May 12, 2026, at 10:00 AM EST at 588 Weyland Road, F. 1308, Langley AFB, VA. Access passes must be requested by 12:00 PM EST on May 5, 2026, via email to Erika Allen.
  • Questions Due: May 13, 2026, by 12:00 PM EST.
  • Proposal Due: May 19, 2026, by 5:00 PM EST.

Submission Instructions

  • Submit an itemized quotation on company letterhead, along with supporting specification sheets and pictures.
  • Quotations must be valid for at least 30 days after submission.
  • Contractors must be registered in the System for Award Management (SAM) database.

Additional Notes

  • The Statement of Requirement (SOR) is incorporated by reference and provides detailed specifications. Blueprints are also attached.
  • Davis-Bacon (prevailing wage) requirements are not applicable to this requirement, as clarified in the Q&A document, due to FAR clause 52.222-48.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 19, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 18, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View