Buffalo Creek Boiler Replacement

SOL #: 1240LT26C0020Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
Pike and San Isabel National Forest
PUEBLO, CO, 81008, United States

Place of Performance

Pine, CO

NAICS

Plumbing (238220)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 11, 2026
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Mar 13, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA) Forest Service is soliciting quotes for the Buffalo Creek Boiler Replacement and Electrical Upgrades project at the Buffalo Creek Work Center in Pine, CO. This Total Small Business Set-Aside opportunity involves replacing a high-efficiency propane gas-fired boiler, upgrading electrical panels, performing mold remediation, and reconstructing the boiler room. The magnitude of construction is estimated between $25,000 and $100,000. Quotes are due March 13, 2026.

Scope of Work

The project encompasses several key tasks:

  • Boiler Replacement: Supply and install one high-efficiency propane gas-fired boiler (equivalent to Dunkirk Quantum 90, Q90-200) with all necessary plumbing, electrical components, expansion tanks, solenoids, water lines, and regulators.
  • Plumbing Upgrades: Replace one Caleffi 573012A ½” Backflow Preventer and AutoFill Combination, a two-way ball valve, and approximately 14 feet of various copper water lines.
  • Electrical System Upgrade: Convert two outdated electrical panels (in the entryway and attic) to junction boxes, extending circuits to one new, code-compliant, and properly grounded electrical panel. Existing system information highlights potential hazards like a Federal Pacific Stab-lok panel.
  • Mold Remediation: Perform water damage mitigation in the boiler room, including temporary plumbing removal, tearing out contaminated plywood and wet insulation, cleaning, HEPA vacuuming, and applying an antimicrobial agent.
  • Boiler Room Reconstruction: Restore the boiler room interior and surrounding areas post-mitigation, including insulation, plywood installation, painting, and final cleaning.
  • Option Item: Thermostat replacement, contingent on contractor examination.

Contract Details & Performance

  • Contract Type: Combined Synopsis/Solicitation (RFQ for commercial items, FAR Part 12).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Place of Performance: Buffalo Creek Work Center, 18046 CO RD 126, Pine, CO 80470.
  • Period of Performance: Estimated April 1, 2026, through May 20, 2026. The USDA requires completion by April 30, 2026.
  • Bonds: Performance and Payment Bonds (100% of award price) are required within 10 days of award.
  • Wage Determination: Contractors must adhere to the General Decision Number for residential construction in Colorado, outlining prevailing wage rates and fringe benefits (Davis-Bacon Act).

Submission & Evaluation

  • Evaluation Criteria: Award will be made to the offeror representing the best value to the Government, based on Factor 1 (Experience/Past Performance), Factor 2 (Technical Approach), and Factor 3 (Price).
  • Submission Requirements: Quotes must include Experience/Past Performance (max 3 pages), a Written Technical Approach (2-4 pages, including construction schedule), and Attachment 2 - Schedule of Items with Prices.
  • Offer Acceptance Period: 60 calendar days from receipt of offers.

Key Dates

  • Site Visit: February 25, 2026, at 1:00 PM Mountain Time. Contact Corey Lewenkamp (corey.lewenkamp@usda.gov, 719-744-7196).
  • Questions Due: March 4, 2026, by 12:00 PM Central Time, via email to Erick Plamann (erick.plamann@usda.gov).
  • Quotes Due: March 13, 2026, by 12:00 PM Central Time, via email to Erick Plamann (erick.plamann@usda.gov).

People

Points of Contact

Erick PlamannPRIMARY
Lucas DahlmanSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Buffalo Creek Boiler Replacement | GovScope