Building 1231 Replace RTU

SOL #: N4008526R9006Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 17, 2025
2
Last Updated
Jan 28, 2026
3
Submission Deadline
Jan 23, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the replacement of Rooftop Units (RTUs) at Building 1231, Marine Corps Exchange, Marine Corps Base Camp Lejeune, NC. This project, designated as a Total Small Business Set-Aside, involves the removal and installation of RTU-7 and RTU-10, along with associated electrical and mechanical work. The estimated cost range is $250,000 to $500,000. Proposals are due January 23, 2026, at 3:00 PM EST.

Scope of Work

This project focuses on the repair or alteration of miscellaneous buildings by replacing two critical rooftop units. The scope includes:

  • Removal and replacement of RTU-7 and RTU-10.
  • Incidental related work, including electrical and mechanical modifications.
  • Crane work and rooftop change-out must occur at night (2000-0700).
  • Roof penetrations must be completed and weather-tight on the same day.
  • RTU removal and replacement must be performed two units at a time, with units operational within 24 hours.
  • No work is permitted between November 1st and December 31st.
  • Detailed architectural, engineering, mechanical, and electrical drawings are provided, outlining demolition, new installation plans, ductwork, piping, controls, and electrical reconnections.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (Request for Proposal)
  • Estimated Value: $250,000 - $500,000
  • Contract Completion: 360 days after award.
  • Liquidated Damages: $880 per Calendar Day.
  • Wage Determination: NC20260010, dated 01/02/2026.
  • Bond Requirements: Payment bond for proposals $35K+, Bid, Payment, and Performance bonds for proposals $150K+. No bonds for proposals less than $35K.

Eligibility & Set-Aside

This is a Total Small Business Set-Aside (FAR 19.5). However, only Mechanical MACC Contractors listed on the General Requirements cover page are eligible to submit proposals. The solicitation specifically lists Mechworks Mechanical Contractors, Inc.; North State Mechanical, Inc.; and R&W Construction Company, Inc.

Submission & Evaluation

  • Proposal Due Date: January 23, 2026, at 3:00 PM EST.
  • Proposal Submission: Via email to Edward.e.pelser.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
  • Requests for Information (RFIs) Cut-off: January 5, 2025, by 2:00 PM EST.
  • Site Visit: Scheduled for December 30, 2025, at 10:00 AM at Building 1231.
  • Basis for Award: Lowest Price.
  • Proposal Acceptance Period: 60 days from receipt of offers.
  • Amendment Acknowledgment: Bidders must acknowledge receipt of all amendments (0001 and 0002) with their proposal submission.

Key Requirements & Notes

  • Tenant requires 14 days' notice before rooftop change out.
  • Supervision: One person may fulfill Superintendent, Quality Control Manager, and Safety & Health Officer roles if qualified.
  • Clarifications have been provided regarding existing roof curb reuse, wind rated calculations, electrical room locations, wiring, ceiling types, ATFP emergency stops, dust walls, HHW valve locations, ceiling/roof height, and existing conduit.
  • Funding may not be available; no award will be made if funds are not available. Offerors will not be reimbursed for proposal costs.
  • Executive Order 13706 (Paid Sick Leave for Federal Contractors) and Buy American Requirement-Construction Materials provision apply.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4
Award Notice
Posted: Jan 28, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Jan 21, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Jan 14, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Dec 17, 2025
View