BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS

SOL #: W519TC26RA021Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

IL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Construction Of Electronic And Communications Facilities (Y1BG)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 24, 2026
2
Response Deadline
Apr 10, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army has issued a Presolicitation for BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS at Rock Island Arsenal, IL. This construction project is estimated to be between $250,000 and $500,000. The full solicitation is expected to be released by March 27, 2026, with responses anticipated by April 10, 2026.

Scope of Work

This project involves the relocation of existing bus ducts, multiple conduits, and communication cables within Building 299, Zone 8. Key tasks include:

  • Bus Duct Relocation: Moving a 1200-amp Square D, I-Line bus duct (approx. 300 ft east, with 50 ft extension and new plugs) and two 800-amp Siemens, Spectra series bus ducts (one approx. 110 ft within Zone 8, another approx. 110 ft from Zone 6 to Zone 8, with 40 ft extension and new plugs).
  • Conduit & Cable Relocation: Moving various conduits and communication lines to be closer to roof trusses and above heaters, including specific movements near columns and for panel PP-299-C9. This also involves removing drop cords, capping wiring, and removing sections of electrical bus and a large junction box protruding into high bay areas.
  • General Requirements: Contractor must verify wiring/power, adhere to national electrical codes, and locate conduits as close to roof trusses as possible.

Contract & Timeline

  • Opportunity Type: Presolicitation (for a construction contract)
  • Estimated Magnitude: $250,000.00 to $500,000.00
  • Product Service Code: Y1BG (Construction Of Electronic And Communications Facilities)
  • Set-Aside: None specified
  • Expected Solicitation Release: By March 27, 2026
  • Pre-construction Site Visit: April 2, 2026, at 10:00 AM Central Time
  • Expected Response Due: April 10, 2026, 2:00 PM Z
  • Published Date: March 24, 2026

Place of Performance

Building 299, Zone 8, Rock Island Arsenal, IL 61299, United States. Work hours are Monday-Thursday, 0600-1530, excluding holidays, unless coordinated.

Special Requirements

Contractors must comply with all Rock Island Arsenal security requirements, including background checks, Anti-Terrorism Level I, and iWatch training. A Real ID will be required for entry starting May 3, 2025. Contractors are responsible for site inspections, providing all labor, materials, and equipment, and adhering to OSHA and RIA safety standards. Any ambiguities must be reported in writing to the contracting officer before the bid closing date.

Contact Information

JOHN JACOBSEN at JOHN.E.JACOBSEN16.CIV@ARMY.MIL.

People

Points of Contact

JOHN JACOBSENPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Pre-Solicitation
Posted: Mar 24, 2026
BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS | GovScope