BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS

SOL #: W519TC26RA021Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

IL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 24, 2026
2
Last Updated
Apr 20, 2026
3
Submission Deadline
Apr 28, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting proposals for BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS at Rock Island Arsenal, IL. This Firm Fixed-Price (FFP) contract, estimated between $250,000 and $500,000, involves the relocation of electrical bus ducts, conduits, and communication cables. Amendment 0001 extended the response due date to April 28, 2026, at 1000 Central.

Scope of Work

This project requires the relocation of three existing bus ducts and numerous conduits and communication cables within Building 299, Zone 8. Key tasks include:

  • Bus Duct Relocation: Moving a 1200-amp Square D I-Line bus duct (approx. 300 ft east, 50 ft extension, specific bus plugs), an 800-amp Siemens Spectra series bus duct (approx. 110 ft), and another 800-amp Siemens Spectra series bus duct (approx. 110 ft, 40 ft extension, specific bus plugs).
  • Conduit & Cable Relocation: Rerouting various conduits and communication lines above heaters and closer to roof trusses, including specific movements near columns and for panel PP-299-C9.
  • Removals: Removing drop cords, associated supports, sections of electrical bus protruding into high bay areas, and a large junction box.
  • General Requirements: Contractor must verify wiring/power, adhere to national electrical codes, and ensure all furnished equipment is new and unused. Refurbished bus duct may be acceptable with a warranty if new is not feasible.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP)
  • Period of Performance: 150 calendar days from notice to proceed.
  • Estimated Magnitude: $250,000.00 - $500,000.00
  • Set-Aside: None explicitly stated, but standard FAR clauses for small businesses apply.
  • Bonds: Performance and Payment Bonds are required.
  • Wage Rates: Davis-Bacon Act WD # IL20260001 Modification 3 applies.

Key Requirements & Notes

  • Place of Performance: Building 299, Zone 8, Rock Island Arsenal, IL.
  • Security: Strict compliance with Rock Island Arsenal security requirements, including background checks, PIV, Force Protection Condition (FPCON) changes, Anti-Terrorism Level I, and iWatch training. No Common Access Card (CAC) will be issued. Real ID is required for entry starting May 3, 2025.
  • Site Inspection: Contractors are solely responsible for site inspections and measurements prior to design and installation. A site visit was held on April 2, 2026, and related Q&A has been published.
  • Safety: Adherence to OSHA and RIA safety standards, including confined space work, PPE, fire prevention, and permits for open-flame devices.
  • Materials: Contractor is responsible for providing all labor, materials, hardware, tools, and equipment.
  • Fire Alarm System: The electrical contractor must hire Johnson Controls for fire alarm system silencing, troubleshooting, and reprogramming, bearing the associated costs.
  • Quality Assurance: Performance will be monitored via a Quality Assurance Surveillance Plan (QASP), with 100% adherence to NEC and safety regulations as key performance thresholds.

Submission & Evaluation

  • Evaluation: Award will be made to the lowest price, responsive, and responsible contractor. Cost data is not required with the proposal but may be requested.
  • Response Due: April 28, 2026, at 1000 Central.
  • Contact: JOHN JACOBSEN, JOHN.E.JACOBSEN16.CIV@ARMY.MIL. Bidders must report any ambiguities or discrepancies in writing to the contracting officer before the bid closing date.

People

Points of Contact

JOHN JACOBSENPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: Apr 20, 2026
View
Version 4Viewing
Solicitation
Posted: Apr 8, 2026
Version 3
Solicitation
Posted: Mar 27, 2026
View
Version 2
Solicitation
Posted: Mar 25, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 24, 2026
View