BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS

SOL #: W519TC26RA021Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

IL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 24, 2026
2
Last Updated
Apr 20, 2026
3
Submission Deadline
Apr 28, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, ACC-RI, is soliciting proposals for BUILDING 299 ZONE 8 BUS DUCT RELOCATIONS at Rock Island Arsenal, IL. This project involves the relocation of electrical bus ducts, conduits, and communication cables to facilitate equipment installation. The government intends to award a Firm Fixed Price (FFP) contract with an estimated magnitude between $250,000 and $500,000. Proposals are due by April 28, 2026, at 10:00 AM Central Time.

Scope of Work

The project requires the relocation of three existing bus ducts and multiple conduits and communication cables within Building 299, Zone 8. Key tasks include:

  • Bus Duct Relocation:
    • Relocate a 1200-amp Square D bus duct approximately 300 feet east, extending it by 50 feet and adding specific bus plugs.
    • Relocate an 800-amp Siemens bus duct approximately 110 feet from between columns C9 and C12 to column C12.
    • Relocate another 800-amp Siemens bus duct from Building 299 Zone 6 to Building 299 Zone 8, extending it by 40 feet and adding specific bus plugs.
  • Conduit and Cable Relocation: Move various conduits and communication lines, rerouting them above heaters and closer to roof trusses. This includes specific movements near columns, panel PP-299-C9, and between various column ranges.
  • Removal: Remove drop cords, associated support items, sections of electrical bus protruding into high bay areas, and a large junction box.
  • General: Contractor must verify wiring/power, adhere to National Electrical Codes, and use new/unused equipment (refurbished bus duct acceptable if new is not feasible, with warranty). The contractor is responsible for hiring Johnson Controls for fire alarm system work and covering associated costs.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Estimated Magnitude: $250,000 - $500,000
  • Period of Performance: 150 calendar days from Notice to Proceed.
  • Set-Aside: None specified. Standard FAR clauses regarding small business concerns are included.
  • Evaluation: Award will be made to the lowest price, responsive, and responsible contractor.

Key Dates & Site Visit

  • Mandatory Site Visit: April 2, 2026, at 11:00 AM Central Time. Contact JOHN.E.JACOBSEN16.CIV@ARMY.MIL to attend.
  • Proposal Due Date: April 28, 2026, at 10:00 AM Central Time.

Special Requirements

Contractors must comply with strict Rock Island Arsenal security requirements, including background checks, Anti-Terrorism Level I, and iWatch training (no CAC issued; Real ID required from May 3, 2025). The contractor is solely responsible for pre-design site inspections and measurements. Compliance with OSHA, RIA safety standards, and fire prevention measures is mandatory. Performance and Payment Bonds are required, and the Davis-Bacon Act applies. A Quality Assurance Surveillance Plan (QASP) will monitor 100% adherence to NEC and safety regulations.

People

Points of Contact

JOHN JACOBSENPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: Apr 20, 2026
Version 4
Solicitation
Posted: Apr 8, 2026
View
Version 3
Solicitation
Posted: Mar 27, 2026
View
Version 2
Solicitation
Posted: Mar 25, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 24, 2026
View