C--New DES TO for Afterthought Mine Site RIFS
SOL #: 68HE0925R0031Pre-Solicitation
Overview
Buyer
Environmental Protection Agency
Environmental Protection Agency
REGION 9 CONTRACTING OFFICE
SAN FRANCISCO, CA, 94105, United States
Place of Performance
Ingot, CA
NAICS
Remediation Services (562910)
PSC
A&E Management Engineering Services (C214)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jun 5, 2025
2
Last Updated
Oct 1, 2025
3
Response Deadline
Jun 19, 2025, 11:30 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
New Design and Engineering Services Task Order for the Afterthought Mine Superfund Site Remedial Investigation Feasibility Study (RIFS).
Contractor to provide technical support to the US EPA at the Afterthought Mine Superfund Site near Ingot, CA. Various work activities include remedial investigation/feasibility study (RI/FS) are needed. Taskings will provide a factual and analytical basis for public understanding of the remedy options, and for US EPA decisionmakers to use in making an informed remedy selection in a sitewide Record of Decision (ROD). The end product shall be a well-supported ROD that when implemented through a remedial action, will eliminate, reduce, or control risks to human health and the environment.
TOCOR: John Hillenbrand, Alternate TOCOR: Eric Canteenwala; Project Officer/Invoice Approver (PO/IA): Lisa Ouyang, Alternate Project Officer: Sandra O'Neill.
The program requests a new TO be funded at the IGCE base of $265,613.11.
The Acquisition Package includes:
• SOW
• IGCE: Base of $265,613.11, overall total of $15,474,151.85
• Task Order Initiation Form
• Key Personnel and Evaluation Factors
• COR Nom forms (4)
• NDAs (7 – Luke, Wanda, and Mena are the additional 3 forms)
• COI forms (same as above)
• QARF
• EO Compliance Approval Email: Documents the program sending our approval request to Fatima and her confirmation it’s been sent to MSD.
These documents are attached as supporting documents in this PR.
Contractor to provide technical support to the US EPA at the Afterthought Mine Superfund Site near Ingot, CA. Various work activities include remedial investigation/feasibility study (RI/FS) are needed. Taskings will provide a factual and analytical basis for public understanding of the remedy options, and for US EPA decisionmakers to use in making an informed remedy selection in a sitewide Record of Decision (ROD). The end product shall be a well-supported ROD that when implemented through a remedial action, will eliminate, reduce, or control risks to human health and the environment.
TOCOR: John Hillenbrand, Alternate TOCOR: Eric Canteenwala; Project Officer/Invoice Approver (PO/IA): Lisa Ouyang, Alternate Project Officer: Sandra O'Neill.
The program requests a new TO be funded at the IGCE base of $265,613.11.
The Acquisition Package includes:
• SOW
• IGCE: Base of $265,613.11, overall total of $15,474,151.85
• Task Order Initiation Form
• Key Personnel and Evaluation Factors
• COR Nom forms (4)
• NDAs (7 – Luke, Wanda, and Mena are the additional 3 forms)
• COI forms (same as above)
• QARF
• EO Compliance Approval Email: Documents the program sending our approval request to Fatima and her confirmation it’s been sent to MSD.
These documents are attached as supporting documents in this PR.
People
Points of Contact
Hill, WandaPRIMARY
Files
Files
No files attached to this opportunity