Afterthought Mine Site RIFS
SOL #: 68HE0925R0031Solicitation
Overview
Buyer
Environmental Protection Agency
Environmental Protection Agency
REGION 9 CONTRACTING OFFICE
SAN FRANCISCO, CA, 94105, United States
Place of Performance
Ingot, CA
NAICS
Remediation Services (562910)
PSC
A&E Management Engineering Services (C214)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jun 5, 2025
2
Last Updated
Oct 1, 2025
3
Submission Deadline
Sep 3, 2025, 11:30 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Design and Engineering Services Task Order for the Afterthought Mine Superfund Site Remedial Investigation Feasibility Study (RIFS). The purpose of this solicitation is to request proposal to conduct a Remedial Investigation Feasibility Study (RIFS) and end-product Record of Decision (ROD) at the Afterthought Mine Superfund Site near Ingot, CA. Contractor to provide technical support to the US EPA at the Afterthought Mine Superfund Site near Ingot, CA. Various work activities including remedial investigation/feasibility study (RI/FS) are needed. Taskings will provide a factual and analytical basis for public understanding of the remedy options, and for US EPA decisionmakers to use in making an informed remedy selection in a sitewide Record of Decision (ROD). The end product shall be a well-supported ROD that when implemented through a remedial action, will eliminate, reduce, or control risks to human health and the environment.
The contractor shall provide all supervision, personnel, equipment and materials in order to successfully perform the work described within the SOW.
Period of Performance: 10/01/2025 - 09/30/2029
The contractor shall provide all supervision, personnel, equipment and materials in order to successfully perform the work described within the SOW.
Period of Performance: 10/01/2025 - 09/30/2029
People
Points of Contact
Hill, WandaPRIMARY
Files
Files
No files attached to this opportunity