C1DA--657A4-26-101, Replace Electrical Switchboards Building 1, 7 and 20

SOL #: 36C25526R0054Pre-Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
255-NETWORK CONTRACT OFFICE 15 (36C255)
LEAVENWORTH, KS, 66048, United States

Place of Performance

Poplar Bluff, Missouri

NAICS

Engineering Services (541330)

PSC

Architect And Engineering Construction: Hospitals And Infirmaries (C1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Feb 5, 2026
3
Response Deadline
Feb 23, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) is seeking Architectural & Engineering (A/E) services for Project 657A4-26-101, involving the replacement of electrical switchboards in Buildings 1, 7, and 20 at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. This is a Presolicitation for a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. SF330 qualification packages are due by February 23, 2026, at 2:00 PM Central Time.

Scope of Work

The A/E firm will provide comprehensive services including design development, detailed design, and preparation of construction documents for an electrical infrastructure upgrade. This project requires compliance with all current VA standards, design guides, and codes. The scope may also involve demolition, new construction of architectural systems, HVAC, plumbing, data/voice, security, structural modifications, hazardous material abatement, life safety systems, seismic compliance, and interior finishes. Key deliverables include preliminary layout, schematic design, design development, 60% and 90% construction documents, bid documents, conformed drawings, and as-built drawings. A phase plan to minimize facility impact during construction is required, as is a secure file-sharing website (Procore or Oracle preferred). A third-party firm must be engaged for fire protection and life safety reviews.

Contract & Timeline

  • Type: Presolicitation for A/E Services (anticipated Firm Fixed Price contract)
  • Estimated Construction Magnitude: $10,000,000 to $20,000,000
  • Anticipated Design Completion: Approximately 270 calendar days
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • SF330 Due: February 23, 2026, 2:00 PM Central Time
  • Published: February 5, 2026

Submission & Evaluation

Interested A/E firms must submit one (1) completed Standard Form 330 (SF330) qualification package (Parts I and II) electronically to Matthew.Finley@va.gov and Lucia.Cowsert@va.gov. The SF330, including additional pages, shall not exceed sixty-five (65) pages. Key clarifications for submission:

  • Environmental Safety & Health Personnel: Intended as part of the design team for reviews; an environmental engineer is ideal.
  • Designer of Record Licensure: Must be professionally registered in Missouri or a state recognized by Missouri. Consult the Missouri Division of Professional Registration website for reciprocity information. This requirement is not waived for Federal Campuses.
  • Organizational Chart: Required for staff relevant to this project only, on 8.5 x 11 pages.
  • CPARS: Final CPARS are preferred, but firms may also provide past performance questionnaires or similar documentation if final CPARS are unavailable. Selection criteria, in descending order of importance, include: Professional Qualifications, Specialized Experience and Technical Competence, Capacity to Accomplish Work, Past Performance, Estimating Effectiveness, and Claims, Terminations and Litigation.

Additional Notes

This is a request for SF 330s; no solicitation document is available at this time. Award is contingent upon the availability of funds.

People

Points of Contact

Lucia CowsertContract SpecialistPRIMARY

Files

Files

Download
Download
Download

Versions

Version 3Viewing
Pre-Solicitation
Posted: Feb 5, 2026
Version 2
Pre-Solicitation
Posted: Jan 26, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 15, 2026
View
C1DA--657A4-26-101, Replace Electrical Switchboards Building 1, 7 and 20 | GovScope