J--CA FARALLON NWR PHOTVOLTAIC INSP & MAIN`
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is an Award Notice for a past solicitation by the US Fish and Wildlife Service for photovoltaic and electrical system inspection, maintenance, and upgrade services at the Farallon Islands National Wildlife Refuge. This opportunity was a Total Small Business Set-Aside. The solicitation period has closed, with quotes due on March 6, 2026.
Opportunity Details
The solicitation, issued as an RFQ, sought contract support for the inspection, maintenance, and upgrade of the photovoltaic and electrical system. The primary deliverable was a "Farallon Photovoltaic System Inspection." Services were to be provided for a base year.
- NAICS Code: 238210 ($19M size standard)
- PSC Code: J059 (Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components)
Contract & Timeline
- Contract Type: Firm-fixed-price (anticipated)
- Period of Performance: One base year, with the base item (00010) from March 16, 2026 to October 30, 2026. An option item (00020) had a period from March 16, 2026 to October 31, 2026.
- Set-Aside: Total Small Business Set-Aside (100%)
- Solicitation Issue Date: February 23, 2026
- Request for Information Due: Noon Central on February 27, 2026 (past)
- Quotes Due: 17:00 Central Time on March 6, 2026 (past)
Submission & Evaluation (Historical)
Quotes were requested from responsible small business sources. Award was to be made on the basis of Price First, then Other Factors, evaluated in accordance with FAR provision 52.212-2 – Evaluation -- Commercial Items. Submission instructions included providing quotations on company letterhead or SF-1449 form with SAM.gov UEI code, point of contact information, and completed FAR provision 52.212-3 Offeror Representations and Certifications. Contractors were required to be registered in SAM.gov.
Important Context for Future Bidders
Accessing the Farallon Islands National Wildlife Refuge involves strict regulations, safety procedures, and environmental considerations. Bidders should be aware of requirements for ocean crossing, landing procedures, rules for visiting, suggested clothing, and rules for living and working on the island. The site has specific notices regarding asbestos and lead awareness. A maintenance report from April 2022 detailed the existing PV power system's condition, highlighting areas requiring repair and maintenance, which is crucial for understanding the scope and challenges of this type of work in harsh environments.
Contact Information
- Contracting POC: Tanner Frank (tanner_frank@fws.gov)
- Technical POC: Mackenzie Cahill, Alt POC: Gerry McChesney