CA FLAP SCR T5(1A) – Monterey Bay Sanctuary Scenic Trail Mitigation

SOL #: 6982AF26R000002Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Santa Cruz, CA

NAICS

Forest Nurseries and Gathering of Forest Products (113210)

PSC

Forest Tree Planting Services (F005)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
May 15, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Transportation, Federal Highway Administration is soliciting proposals for mitigation site restoration and enhancement for the CA FLAP SCR T5(1A) Monterey Bay Sanctuary Scenic Trail in Santa Cruz, CA. This is a Total Small Business Set-Aside opportunity for a Firm Fixed-Price contract. Proposals are due May 15, 2026.

Scope of Work

This project involves comprehensive mitigation site restoration and enhancement. Key tasks include selective clearing, site grading, fencing, and gate installation. The scope also covers various services such as dump truck, backhoe loader, wheel loader, general labor, and specialized labor for technical, survey, and biological services. Seeding, mulching, and plantings are required, followed by a five-year maintenance period. Contractors are responsible for determining water sources and designing/building the watering system for maintenance. Compliance with environmental regulations, including stormwater pollution prevention (SWPPP), protection of property and landscape, and wildlife surveys, is mandatory. Plant and seed sourcing must strictly adhere to specifications (Sections 625.03 and 626.03), with local nursery plans not being an acceptable substitute for collecting and propagating. Surveying and biological monitoring are contractor responsibilities, and excess dirt disposal must follow Plan Sheet D1.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: Upon award, extending for five (5) years.
  • Set-Aside: Total Small Business Set-Aside (100% small business concerns).
  • NAICS Code: 113210 – Forest Nurseries and Gathering Forest Product, with a $20.5M size standard.
  • Place of Performance: Santa Cruz, CA.

Submission & Evaluation

Proposals must be submitted electronically as Adobe (pdf) files and include a Technical Proposal, Price Proposal, Past Performance References (last six years), and Organizational Information. Proposals must remain valid for a minimum of 60 days. Evaluation factors and subfactors are detailed in RFO Clause 52.212-2, with technical and past performance considered approximately equal to cost or price. Offerors must be registered in SAM.gov at the time of submission. Amendment A001, which modifies Section D (CONTRACT CLAUSES), must be acknowledged. Alternate proposals are not authorized.

Key Deadlines & Contacts

  • Virtual Pre-Proposal Meeting RSVP: April 20, 2026 (Meeting: April 21, 2026, 1:00 p.m. MDT).
  • Technical Questions Due: May 4, 2026.
  • Proposals Due: May 15, 2026, 8:00 p.m. EDT.
  • Primary Contact: Kelly Palmer (cflacquisitions@dot.gov).
  • Site Visit Contacts: Zachary Ormsby (zormsby@blm.gov) and Ben Hoke (bhoke@blm.gov).

People

Points of Contact

Kelly PalmerPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 29, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View