CA FLAP SCR T5(1A) – Monterey Bay Sanctuary Scenic Trail Mitigation

SOL #: 6982AF26R000002Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Santa Cruz, CA

NAICS

Forest Nurseries and Gathering of Forest Products (113210)

PSC

Forest Tree Planting Services (F005)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
May 22, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Transportation, Federal Highway Administration (FHWA), through its Central Federal Lands Division, is soliciting proposals for CA FLAP SCR T5(1A) – Monterey Bay Sanctuary Scenic Trail Mitigation. This opportunity is a Total Small Business Set-Aside for mitigation site restoration and enhancement in Santa Cruz, CA. The project involves extensive environmental restoration, planting, and a five-year maintenance period. Proposals are due by May 22, 2026.

Scope of Work

This project focuses on mitigation site restoration and enhancement for the Monterey Bay Sanctuary Scenic Trail. Key tasks and deliverables include:

  • Selective clearing, site grading, fencing, and gate installation.
  • Provision of dump truck, backhoe loader, and wheel loader services.
  • General and special labor, including technical, survey, and biological services.
  • Seeding, mulching, and plantings, with specific requirements for seed and plant sourcing (per specifications 625.03 and 626.03).
  • A five-year maintenance period following the award date, during which the contractor is responsible for determining water sources and providing watering methods.
  • Compliance with environmental regulations, including stormwater pollution prevention (SWPPP), protection of property, and wildlife surveys.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: Upon award, extending five (5) years from the date of award.
  • Set-Aside: 100% Total Small Business Set-Aside.
  • NAICS Code: 113210 – Forest Nurseries and Gathering Forest Product (Size Standard: $20.5M).

Submission & Evaluation

Proposals must be submitted electronically as Adobe (PDF) files and remain valid for at least 60 days. Required components include a Technical Proposal, Price Proposal, Past Performance References (last six years), and Organizational Information. Evaluation factors, detailed in RFO Clause 52.212-2, consider technical and past performance approximately equal to cost or price. Offerors must be registered in SAM.gov at the time of proposal submission. Alternate proposals are not authorized.

Key Dates & Clarifications

  • Proposals Due Date: May 22, 2026 (extended by Amendment A002).
  • Technical Questions Due Date: May 4, 2026 (passed).
  • Amendments: Amendment A001 replaced Section D, "CONTRACT CLAUSES." Amendment A002 extended the proposal due date, replaced Section C (Specifications), and updated Plan Sheets C4 and T1.
  • Q&A Clarifications: The contractor is responsible for surveying (Section 152), biological monitoring (Sections 107.10(e)(1), 107.13, and 623.03(c)), and providing water sources/irrigation for maintenance. Excess dirt disposal is indicated on Plan Sheet D1. Existing corrals are not to be removed.
  • Contact: Kelly Palmer, cflacquisitions@dot.gov.

Additional Notes

A virtual pre-proposal meeting was held on April 21, 2026. Bidders should review the latest specifications and plan sheets provided in Amendment A002 and all Q&A documents for comprehensive understanding of requirements.

People

Points of Contact

Kelly PalmerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 29, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: May 8, 2026
Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View