CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS

SOL #: 6982AF25B000013Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Cima, CA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 26, 2026
2
Last Updated
May 13, 2026
3
Submission Deadline
May 19, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Central Federal Lands Highway Division, in coordination with the National Park Service, is soliciting bids for road improvements within the Mojave National Preserve, San Bernardino County, CA. This Invitation for Bid (IFB), estimated between $80,000,000 and $120,000,000, covers approximately 56.5 miles of roads. Bids are due May 19, 2026.

Scope of Work

The project involves comprehensive improvements to Kelso-Cima Road (19.3 miles), South Kelbaker Road (22.3 miles), and Morningstar Mine Road (14.9 miles). Work primarily includes resurfacing, restoration, and rehabilitation. Key tasks for Kelso-Cima and South Kelbaker Roads involve full depth reclamation of existing pavement, placement of new asphalt, increasing roadway width to 26 feet, minor realignment, reinforcing 48 low water crossings, and improving safety with mumble strips, signing, pavement markings, and paved pullouts. Morningstar Mine Road improvements consist of full depth reclamation and placement of surface-course aggregate.

Principle work items include:

  • 110,000 tons of asphalt concrete pavement
  • 133,000 tons of roadway aggregate
  • 81,000 tons of aggregate surface course
  • 110,000 cubic yards of roadway excavation
  • 49 miles of full depth reclamation
  • 17,000 linear feet of concrete barrier
  • 44 miles of tortoise barrier fence and 2,400 linear feet of tortoise crossing structures
  • 12,000 cubic yards of rip rap

Contract & Timeline

  • Type: Invitation for Bid (IFB), Firm Fixed Price with Economic Price Adjustment
  • Estimated Value: $80,000,000 - $120,000,000
  • Set-Aside: Full and Open Competition with HUBZone Price Preference (10% price evaluation factor for non-HUBZone offers). Small business goals are 43.02%.
  • NAICS: 237310 (Highway, Street & Bridge Construction), $45 million size standard
  • Response Due: May 19, 2026, at 7:00 PM ET
  • Anticipated NTP: July 20, 2026
  • Project Duration: Estimated 2.5 working years

Special Considerations

The project is located in a natural resource sensitive area, requiring strict adherence to environmental constraints, particularly concerning desert tortoises (USFWS-Authorized Biologist required March 1st to October 31st). A Project Labor Agreement (PLA) is required. Work within 25 feet of Union Pacific Railroad (UPRR) tracks necessitates railroad-approved flagmen and UPRR Right of Entry Agreements. Temporary asphalt plants are not permitted within the Mojave National Preserve. Noxious weed removal is a subsidiary obligation. Prior experience on projects of similar magnitude is required.

Amendments & Submission

Multiple amendments (A001, A002, A003, A004) have been issued, extending deadlines, updating bid schedules, and clarifying technical specifications. Bidders must acknowledge all amendments and use the latest bid schedules. Electronic bids are encouraged, but hard copies are also accepted prior to the bid opening.

Contact Information

For inquiries, contact Jorey Deml at cflcontracts@dot.gov.

People

Points of Contact

Jorey DemlPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 13
Solicitation
Posted: May 13, 2026
View
Version 12Viewing
Solicitation
Posted: May 12, 2026
Version 11
Solicitation
Posted: May 11, 2026
View
Version 10
Solicitation
Posted: May 6, 2026
View
Version 9
Solicitation
Posted: May 5, 2026
View
Version 8
Solicitation
Posted: Apr 29, 2026
View
Version 7
Solicitation
Posted: Apr 27, 2026
View
Version 6
Solicitation
Posted: Apr 27, 2026
View
Version 5
Solicitation
Posted: Apr 22, 2026
View
Version 4
Solicitation
Posted: Apr 21, 2026
View
Version 3
Solicitation
Posted: Apr 17, 2026
View
Version 2
Solicitation
Posted: Apr 13, 2026
View
Version 1
Solicitation
Posted: Mar 26, 2026
View