Cannelton Lock and Dam Lock Interlocks and Dam Encoders Upgrade
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The work includes updates to the existing miter gate controls, valve controls, and lock operationsinterlock system to bring system into compliance with current Inland Marine Transportation SystemInterlock Standard, along with the replacement of the existing dam tainter gate height position encodersand associated hardware. Additionally, any and all incidental related work.
AMENDMENT 4: 4 August 2025 THIS AMENDMENT SERVES TO EXTEND THE DUE DATE OF BIDS FROM 30 JULY 2025 10:00 AM TO 7 AUGUST 2025 10:00 AM, AND REPLACE THE PLANS & SPECS IN
THEIR ENTIRETY.
THE EXTENSION OF THE BID DATE HAS ALREADY BEEN EXTENDED INFORMALLY ON SAM.
UPDATED WAGE DETERMINATIONS IN20250006, DATED 18 JULY 2025 HAVE BEEN INCLUDED.
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS CLAUSE 252.232-7006 HAS BEEN REMOVED.
AMENDMENT 3: 18 July 2025: This Amendment is to add the updated Price Breakout Schedule and to add the updated Wage Rates.
AMENDMENT 2: 18 July 2025: This Amendment is to change the NAICS code from 238210 to 237990
AMENDMENT 1: 2 July 2025: This Amendment is to add ProjNet Instructions and Reps & Certs. This have been added in the Attachments.