Chapel Activity Center (CAC) Interior Refresh, F528, Vance AFB

SOL #: FP1019545Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3029 71 FTW CVC
ENID, OK, 73705-5037, United States

Place of Performance

Enid, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

No set aside specified

Timeline

1
Posted
May 7, 2026
2
Last Updated
Jun 8, 2026
3
Submission Deadline
Jun 10, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, through the 71 FTW CVC office, is soliciting proposals for an interior refresh of Facility 528, Chapel Activity Center (CAC) at Vance Air Force Base, Enid, OK. This is a Combined Synopsis/Solicitation for commercial services, issued as a Firm-Fixed-Price (FFP) requirement. Proposals are due June 10, 2026, at 11:00 AM CST.

Scope of Work

The project, FP1019545, involves a comprehensive interior refresh of the Chapel Activity Center. Key tasks include:

  • Demolition: Removal of existing flooring, walls, ceilings, cabinets, and fixtures as detailed in Appendix C of the SOW.
  • Asbestos Abatement: Required for specific flooring materials, adhering to Oklahoma Asbestos Control Act and OSHA standards.
  • Interior Finishes: Installation of new flooring (carpet, ceramic tile, rubber wall base), preparation and application of paint on walls, doors, frames, and cabinets, and replacement of ceiling tiles.
  • Kitchen Renovation: Addition of upper and base cabinets, including a cord management hole for a microwave.
  • Appliances: Testing and verification of mechanical and plumbing installations for appliances.
  • Protection: Ensuring existing work and facilities are protected from damage during construction.
  • Clarifications (from Q&A): The intent is to demolish only the ceiling tile and grid (not the entire grid system). Contractors should anticipate adding an additional layer of 1/4-inch plywood over existing plate steel for the subfloor. Backsplash tile should be CT2 Portmore/glossy White (3"x8"), and bathroom wall tile is CT3 Nashville (12"x24"). The specified acoustic ceiling tile is Armstrong Fissured 756 - White 2'x2'x5/8".

Contract & Timeline

  • Contract Type: Firm-Fixed-Price (FFP)
  • Project Duration: 135 calendar days total, including up to 45 days for non-performance (mobilization, lead time) and 90 days for the performance period after receiving a Notice to Proceed.
  • Funding: This requirement is currently unfunded; award is contingent upon the availability of funds.
  • Quote Validity: Offerors must ensure quotes remain valid through September 30, 2026, due to the anticipated funding schedule. Proposals not honoring this period may be deemed non-responsive. Amendment #3 also states 180 days from the solicitation close.
  • Place of Performance: Vance Air Force Base, Enid, OK, Facility 528.

Key Dates & Submission

  • Questions Due: June 4, 2026, to Betty Kliewer (betty.kliewer.ctr@us.af.mil) using the provided Q&A form.
  • Proposals Due: June 10, 2026, 11:00 AM CST, submitted electronically to Betty Kliewer (betty.kliewer.ctr@us.af.mil). Late proposals may not be considered.
  • Site Visit: A site visit was held on May 18, 2026, at 1:00 PM CST at 400 Young Rd, Bldg 200, Rm 114, Enid, OK 73705. Attendees were required to report to Vance Visitor Center F72 for sponsorship.

Important Notes

  • Set-Aside: None specified (Full and Open).
  • Required Forms: Only Appendix B - Bid Form is required for initial proposal submission. Additional documents may be requested later.
  • SAM Registration: All bidders must be actively registered in SAM.gov at the time of proposal submission and award in accordance with FAR 52.204-7.
  • Wage Determination: Bidders must adhere to Wage Determination No. 2015-5857, Revision No. 18, dated December 3, 2025, for minimum wage rates and fringe benefits.
  • Access Requirements: Contractors must comply with Vance AFB access requirements, including Real ID compliant identification and installation security procedures.
  • Government Rights: The Government reserves the right to cancel the solicitation and has no obligation to reimburse offerors for costs.

People

Points of Contact

Vance Local PurchaseSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: May 7, 2026
View