Chapel Activity Center (CAC) Interior Refresh, F528, Vance AFB
SOL #: FP1019545Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA3029 71 FTW CVC
ENID, OK, 73705-5037, United States
Place of Performance
Enid, OK
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
May 7, 2026
2
Last Updated
Jun 8, 2026
3
Submission Deadline
Jun 15, 2026, 4:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, Vance AFB, through ASRC Federal Gulf State Constructors, is soliciting proposals for the interior refresh of Facility 528, Chapel Activity Center (CAC), at Vance Air Force Base, Oklahoma. This is a Firm-Fixed-Price (FFP) requirement under a Full and Open competition. Proposals are due by June 15, 2026, 11:00 AM CST.
Scope of Work
The project involves a comprehensive interior refresh, including:
- Demolition: Removal of existing flooring, walls, ceilings, cabinets, and fixtures as detailed in Appendix C of the SOW. Asbestos abatement is required for specific flooring materials, adhering to Oklahoma and OSHA standards.
- Installation: New flooring (carpet, ceramic tile, rubber wall base), preparation and application of a minimum of two coats of paint, replacement of ceiling tiles, and kitchen renovation (addition of upper and base cabinets, including a cord management hole for a microwave).
- Material Specifications: Backsplash tile is CT2 Portmore/glossy White (3"x8"), and bathroom wall tile is CT3 Nashville (12"x24"). The specified acoustic ceiling tile is Armstrong Fissured 756 - White 2'x2'x5/8".
- Subfloor: Contractors should anticipate adding an additional layer of 1/4-inch AC plywood over existing plate steel, not replacing wood components.
- Duration: The project has a total duration of 135 calendar days, including up to 45 days for non-performance (mobilization, lead time) and 90 days for the performance period after receiving a Notice to Proceed.
Contract Details
- Contract Type: Firm-Fixed-Price (FFP)
- Set-Aside: Full and Open
- Funding Status: Currently unfunded; award is contingent upon the availability of funds.
- Place of Performance: Vance Air Force Base, Enid, OK 73705.
Key Requirements & Clarifications
- Quote Validity: Offerors must ensure their quotes remain valid for 180 days from the solicitation closing date and specifically through September 30, 2026, due to anticipated funding schedules. Proposals not honoring this period may be deemed non-responsive.
- Site Visit: A site visit was held on May 18, 2026. A sign-in sheet from this visit is available.
- Questions & Answers: Two Q&A documents provide clarifications on required forms (only Appendix B - Bid Form initially), demolition scope, subfloor specifications, and material details.
- Wage Determination: Revision No. 18 (Dec 3, 2025) for Oklahoma County, Oklahoma, is provided and must be adhered to for minimum wage rates and fringe benefits.
- SAM.gov Registration: All bidders must be actively registered in SAM.gov at the time of proposal submission and award.
Submission & Deadlines
- Proposals Due: June 15, 2026, 11:00 AM CST.
- Submission Method: Electronically to Betty Kliewer (betty.kliewer.ctr@us.af.mil).
- Contact: Betty S. Kliewer (betty.kliewer.ctr@us.af.mil, 580-213-7582).
People
Points of Contact
Betty S. KliewerPRIMARY
Vance Local PurchaseSECONDARY
Files
Versions
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Jun 8, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 20, 2026
Version 2
Combined Synopsis/Solicitation
Posted: May 8, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 7, 2026