Chemical Resistant Epoxy - Repair and Recoat Floors and Walls

SOL #: W91ZLK-26-R-A006Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-APG DIR
ABER PROV GRD, MD, 21005, United States

Place of Performance

Aberdeen Proving Ground, MD

NAICS

Other Foundation (238190)

PSC

Repair Or Alteration Of Laboratories And Clinics (Z2DB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
May 13, 2026
3
Submission Deadline
May 28, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting proposals for Chemical Resistant Epoxy - Repair and Recoat Floors and Walls at the Sample Receipt Facility (SRF), Building E3401, Aberdeen Proving Ground, MD. This is a 100% Small Business Set-Aside for a Firm-Fixed Price (FFP) contract. The objective is to repair and recoat floors and walls with chemical-resistant epoxy to ensure containment of hazardous chemicals. Proposals are due May 28, 2026, at 4 PM ET.

Scope of Work

The contractor will repair and recoat floors and walls in specific SRF areas, including Rooms 143, 144, 146, SRF Room 134 Bio Lab Entry, an Indoor Dock Area, and a hallway to Room 134 Lab. The work involves stripping old epoxy, grinding surfaces, and applying a new chemical-resistant epoxy coating (10-12 mil base, 14-18 mil topcoat) capable of withstanding organic solvents, strong acids/bases, oxidizing agents, and heavy traffic (up to 10,000 lbs). A 4-inch cove base is required on all walls. The new epoxy color should match existing floors recoated in 2022 and 2024. The contractor is responsible for dust capture and waste disposal.

Contract Details

  • Contract Type: Firm-Fixed Price (FFP)
  • Set-Aside: 100% Small Business Set-Aside (NAICS 238190)
  • Period of Performance: Within three (3) months from award for the base requirement, with option requirements for 12 months.
  • Evaluation: Lowest Price Technically Acceptable (LPTA). Proposals will be evaluated on Technical Approach and Experience.
  • Place of Performance: Sample Receipt Facility (SRF), Building E3401, Edgewood Area, Aberdeen Proving Ground, MD 21010.

Submission Requirements

Proposals must be submitted in two separate volumes:

  • Volume I: Technical Proposal (5-page limit): Must demonstrate a clear understanding of PWS requirements and provide documentation of recent experience (within 5 years) repairing and recoating floors/walls with chemical-resistant epoxy in multiple areas simultaneously.
  • Volume II: Price Proposal (unlimited pages): Must use Attachment 4 (Price List) and include company information (Name, DUNS, CAGE, Business Type/Size, ETN#, POC). Offerors must be registered in SAM.gov. The Government does not intend to conduct discussions; proposals should be the best and final offer.

Key Dates & Contacts

  • Site Visit: Held on May 7, 2026. Attendance was encouraged but not mandatory. RSVP was required by May 6, 2026.
  • Questions Due: May 8, 2026, 4 PM ET, via email to ike.a.wright2.civ@army.mil (Subject: W91ZLK-26-R-A006. Q&A for Combined Synopsis/Solicitation FROM [COMPANY NAME]).
  • Proposals Due: May 28, 2026, 4 PM ET, via email (Subject: W91ZLK-26-R-A006. Proposal FROM [COMPANY NAME]).
  • Primary Contact: Ike Wright, ike.a.wright2.civ@army.mil
  • Secondary Contact: Terrijuana P. Veals, terrijuana.p.veals.civ@army.mil

People

Points of Contact

Terrijuana P. VealsSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 13, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View