Amendment 2 - Cheyenne Mountain SFS Upgrade EST-3 Fire Alarm System to EST-4

SOL #: FA251726A007Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2517 21 CONS BLDG 350
PETERSON SFB, CO, 80914-1117, United States

Place of Performance

Colorado Springs, CO

NAICS

Other Communications Equipment Manufacturing (334290)

PSC

Miscellaneous Alarm, Signal, And Security Detection Systems (6350)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 9, 2026
2
Last Updated
Apr 27, 2026
3
Submission Deadline
May 6, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 21st Civil Engineering Squadron at Peterson Space Force Base, is soliciting quotes for the upgrade of Edwards EST-3 Fire Alarm Systems to EST-4 at Cheyenne Mountain Space Force Station (SFS), CO. This is a Firm Fixed Price, full and open purchase order for commercial items. Quotes are due by Wednesday, May 6, 2026, at 2:00 PM MT.

Scope of Work

This opportunity requires the replacement of twenty-three (23) existing Edwards EST-3 fire alarm control panels (FACPs) with new Edwards EST-4 FACPs. The project involves ensuring seamless integration with existing field devices, providing comprehensive training and documentation, and implementing a redundant network for communication backup. The work is divided into two sequential phases (CLIN-1 and CLIN-2). Key tasks include system design and engineering (site survey, submittal package), equipment procurement, installation and integration (including pre-installation meetings, removal of old panels, installation of new, wiring, software programming, network integration, and testing), training, documentation (as-built drawings, O&M manuals), and project closeout (final inspection, acceptance, warranty). A one-year full, unconditional warranty is required.

Contract Details

  • Contract Type: Firm Fixed Price Purchase Order
  • Set-Aside: Full and Open Competition
  • NAICS Code: 334290 – Other Communications Equipment Manufacturing
  • Size Standard: 800 employees
  • Period of Performance: Delivery Date on or before 180 Calendar Days after receipt of award for all CLINS.
  • Place of Performance: Cheyenne Mountain Space Force Station, Colorado Springs, CO.

Submission & Evaluation

  • Quotes Due: Wednesday, May 6, 2026, at 2:00 PM MT.
  • Questions Due: Monday, March 30, 2026 (Note: This date has passed).
  • Site Visit: Tuesday, March 24, 2026, at 9:00 AM (RSVP by March 18, 2026) (Note: This date has passed).
  • Submission Limit: 30 pages; .zip files are not acceptable.
  • Quote Validity: 60 calendar days.
  • Evaluation Factors: Award will be made to the lowest evaluated price that meets technical and past performance criteria on an acceptable/unacceptable basis.
    • Priced Quote: Lowest evaluated price that is reasonable and complete.
    • Technical Documentation: Acceptable/Unacceptable basis, confirming product meets minimum requirements. Requires NICET Level II certification in Fire Alarm Systems, Edwards FireWorks System manufacturer's certification, and a Colorado state fire alarm work license. A Project Management Plan and Preliminary Schedule (Attachment 4) are required.
    • Past Performance: Acceptable/Unacceptable basis, based on a minimum of 1 and a maximum of 3 projects within the last 5 years of similar scope. Evaluation may use CAGE code, CPARS, SAM.gov, or a Past Performance Questionnaire (Attachment 3).

Key Attachments & Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 9, 2026
View