Amendment 2 - Cheyenne Mountain SFS Upgrade EST-3 Fire Alarm System to EST-4

SOL #: FA251726A007Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA2517 21 CONS BLDG 350
PETERSON SFB, CO, 80914-1117, United States

Place of Performance

Colorado Springs, CO

NAICS

Other Communications Equipment Manufacturing (334290)

PSC

Miscellaneous Alarm, Signal, And Security Detection Systems (6350)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 9, 2026
2
Last Updated
Apr 27, 2026
3
Submission Deadline
May 6, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, through the 21st Civil Engineering Squadron at Peterson Space Force Base, is soliciting quotes for the upgrade of 23 existing Edwards EST-3 Fire Alarm Systems to EST-4 systems at Cheyenne Mountain Space Force Station (SFS), CO. This is a Full and Open Competition for a Firm Fixed-Price Purchase Order. Quotes are due by May 6, 2026.

Scope of Work

This project involves replacing twenty-three (23) existing Edwards EST-3 Fire Alarm Control Panels (FACPs) with new Edwards EST-4 FACPs. The upgrade requires seamless integration with existing field devices and the current FireWorks system, along with the design and installation of a redundant network configuration. Key tasks include:

  • Replacing all EST-3 FACPs with EST-4 FACPs.
  • Maintaining the existing FireWorks system and integrating with current fire detection devices.
  • Ensuring compliance with current fire codes and standards, including NFPA 72, NFPA 70, and UFC.
  • Providing comprehensive documentation, including as-built drawings and O&M manuals, and training for CMSFS personnel.
  • Replacing all Local Rail Modules (LRMs) and 3-CHAS7 chassis assemblies.
  • Contractors are responsible for patch, repair, and paint for flush-mounted annunciator and Local Operating Console (LOC) installations.
  • Adherence to cyber security requirements and Operations Security (OPSEC) Standard Operating Procedures for access to sensitive areas.

Contract & Timeline

  • Contract Type: Firm Fixed-Price Purchase Order.
  • Period of Performance: Delivery required on or before 180 Calendar Days after receipt of award.
  • Site Visit: Tuesday, March 24, 2026, at 0900 (RSVP required by March 18, 2026).
  • Questions Due: Monday, March 30, 2026.
  • Quotes Due: Wednesday, May 6, 2026, at 1400 PM (MT).

Submission & Evaluation

Quotes must be limited to 30 pages and submitted in three parts: a Priced Quote, Technical Documentation, and Past Performance. Technical documentation must confirm:

  • NICET Level II certification in Fire Alarm Systems.
  • Edwards FireWorks System manufacturer's certification.
  • Colorado state fire alarm work license.
  • A Project Management Plan and Preliminary Schedule (Attachment 4). Past performance will be evaluated based on 1-3 projects of similar scope within the last 5 years, using CPARS, SAM.gov, or a Past Performance Questionnaire. Award will be made on a Lowest Evaluated Price Technically Acceptable (LPTA) basis to the responsible offeror whose quote is most advantageous, meeting acceptable technical and past performance criteria.

Eligibility & Special Requirements

This is a Full and Open Competition under NAICS Code 334290 – Other Communications Equipment Manufacturing, with a size standard of 800 employees. All companies must be registered in SAM.gov. Contractors are responsible for providing their own escorts within the Restricted Area, possessing a Cheyenne Mountain Restricted Area badge with escorting privileges. On-site space for material staging can be made available. The government does not intend to provide existing as-built drawings, as they are likely inaccurate.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 9, 2026
View