City View Project

SOL #: 205AE9-26-Q-00059Combined Synopsis/Solicitation

Overview

Buyer

Treasury
Internal Revenue Service
IT STRATEGY AND MODERNIZATION
Washington, DC, 20224, United States

Place of Performance

Guaynabo, PR

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 23, 2026
2
Last Updated
Apr 30, 2026
3
Submission Deadline
May 7, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Internal Revenue Service (IRS) is seeking contractor support for the City View Project, an upgrade of data cabling to comply with industry standards at IRS Building PR4001 in Guaynabo, Puerto Rico. This is a Total Small Business Set-Aside issued as a Request for Quote (RFQ) for commercial items/services. Quotes are due by Thursday, May 7, 2026, at 12:00 PM Eastern.

Scope of Work

The project involves a comprehensive upgrade of the data cabling infrastructure. Key tasks include:

  • Cable Plant Planning & Design: Review, selection, and procurement of components.
  • Installation: Installation of CAT 6A structured cabling systems (approximately 300 drops, plus 6 new data drops) over drop ceilings and refresh of network racks at the Main Distribution Frame (MDF) room.
  • Equipment: Provision of materials such as CAT 6A cable, jacks, patch cords, patch panels, and rack management components. Six (6) 20A APC metered rack PDUs are required.
  • Compliance: Installation must adhere to ANSI/TIA/EIA-568-C.2, ANSI/TIA-942, ANSI/TIA-607-C, and BICSI 002 standards, including IRS-specific clearance and cable management requirements.
  • Testing & Documentation: Detailed testing (EIA/TIA-568-C standards) and documentation of all installed systems, including as-built diagrams and comprehensive testing reports.
  • Legacy Management: Contractor is responsible for the removal and disposal of legacy cabling according to federal guidelines.
  • Warranty: A one (1) year workmanship warranty and a twenty-five (25) year manufacturer's warranty are required.

Contract Details

  • Contract Type: Firm Fixed Price (FFP) Purchase Order.
  • Period of Performance: Expected 4-8 weeks after the date of award.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238210, Electrical Contractors and Other Wiring Installation Contractors (Small Business Size Standard: $19 Million).
  • PSC Code: N059, Installation Of Equipment: Electrical And Electronic Equipment Components.
  • Place of Performance: IRS Building PR4001, Guaynabo, PR 00968.

Submission & Evaluation

  • Quote Submission Deadline: Thursday, May 7, 2026, by 12:00 PM Eastern.
  • Submission Method: Email price quotes to Nakia Barriteau, Contracting Officer, at Nakia.R.Barriteau@irs.gov.
  • Quote Format: Standard 8-1/2" x 11" paper, single-spaced, 1" margins, Times New Roman, 12pt font. Acceptable formats include MS Word, Adobe Acrobat (.pdf), or MS Excel attachments. The main body is limited to five (5) pages (Cover Letter, SF 1449, and Section B CLIN Structure do not count).
  • Evaluation Criteria: Award will be made to the responsible offeror with the lowest evaluated price who meets all requirements in the Statement of Work.
  • SAM Registration: Offerors must be registered and have an active record in SAM.gov at the time of submission.

Key Clarifications & Notes

  • This is a new award; a previous solicitation (205AE9-26-Q-00010) was canceled.
  • Hardware requirements are brand-name or equal.
  • Standard work hours apply, but network cutovers may be performed after hours or on weekends.
  • Site visits, surveys, or walkthroughs are not offered due to turnaround time and staffing.
  • Existing cable trays are in place and accessible for routing.
  • The scope references ANSI/TIA-607, indicating rack grounding is needed.
  • The deadline for questions was April 30, 2026.

People

Points of Contact

Nakia BarriteauPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
City View Project | GovScope