CNS Finished Water Tank

SOL #: FA557526B0001Solicitation

Overview

Buyer

APO, AE, 09643-6585, United States

Place of Performance

Moron AB, ES-SE, Spain

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Architect And Engineering Construction: Open Storage Facilities (C1GD)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 7, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 7, 2026, 9:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Air Force is soliciting proposals for the CNS Finished Water Tank project (QUUG 19-1003) at Moron Air Base, Spain. This project involves the construction of an 800,000-gallon (approximately 3,029 m³) elevated potable water storage tank. The estimated magnitude is between $1,000,000 and $5,000,000 USD. This opportunity is ONLY FOR LOCAL SOURCES licensed and registered to conduct construction business in Spain. Bids are due by 1100 hours local time on May 7, 2026.

Scope of Work

The project encompasses comprehensive civil, structural, architectural, mechanical, and electrical works. Key tasks include:

  • Civil Works: Demolition, new fencing, trenching for utilities, drainage, and access road construction.
  • Structural Works: Reinforced concrete footings, bracing beams, and a galvanized metal structure to support the tank.
  • Architectural Work: Selective demolition, new steel door, brick partitions, and safety systems for Building #558.
  • Mechanical Works: Provision and installation of the 800KGal cylindrical elevated tank, underground potable water piping, a chlorination/pH control dosing system, and a fall arrestor system.
  • Electrical Works: Underground electrical distribution, interior/exterior lighting, lightning protection, a new 10 kVA dry transformer, cathodic protection for the tank, and a TV camera.
  • Miscellaneous Works: Provision and coordination of a control system for the new water tank, repairs, final cleaning, and testing of all installed equipment.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: 720 calendar days from contract award.
  • Estimated Magnitude: $1,000,000 - $5,000,000 USD.
  • Eligibility: Restricted to LOCAL SOURCES (companies resident, licensed, and registered to conduct construction business in Spain). Compliance with Spanish legislation for government works is mandatory.
  • Special Requirements: A two-year commercial warranty is required. The contractor must obtain all necessary permits and authorizations for base access.

Submission & Evaluation

  • Bid Submission Deadline: May 7, 2026, at 1100 hours local time.
  • Submission Method: Bids must be submitted electronically in CD form (.pdf format) and a printed copy is recommended. Hand-carried proposals require advance coordination for base access.
  • Evaluation Criteria: Award will be based on price and price-related factors to the lowest responsive bidder, without discussions.
  • Pre-proposal Conference/Site Visit: April 20, 2026, at 1300 hours local time, in the Contracting Conference room, bldg 106. RSVP via email at least 24 hours prior. Escort required for base access (request 72 hours prior).
  • Questions Due: April 27, 2026, via email.

Important Notes

A Bank Letter of Guarantee is required within ten (10) calendar days after contract award. Contractors must request a "BCE Work Clearance Request" (AF Form 103) before starting work. Specific Spanish classification certificates are required, along with minimum experience for structural/tank manufacturers/installers and control system specialists. Bidders must review Attachments 6 and 7 for environmental compliance criteria and natural resource management plans relevant to Moron AB.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: May 6, 2026
View
Version 3
Solicitation
Posted: Apr 30, 2026
View
Version 2Viewing
Solicitation
Posted: Apr 10, 2026
Version 1
Solicitation
Posted: Apr 7, 2026
View