CNS Finished Water Tank
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Air Force is soliciting bids for the CNS Finished Water Tank project (Project QUUG 19-1003) at Moron Air Base, Spain. This project involves the construction of an 800,000-gallon elevated potable water storage tank. The estimated magnitude is between $1,000,000 and $5,000,000. This solicitation is restricted to local sources licensed and registered to conduct construction business in Spain. Bids are due by 1100 hours local time on May 7, 2026.
Scope of Work
The project encompasses the comprehensive design and construction of an elevated water tank to meet fire fighting and three-day self-sustaining water storage requirements. Key components include:
- Civil Works: Demolition and installation of exterior fencing, trenching for utilities (water, sewage, electrical), new drainage system, and access road construction.
- Structural Works: Reinforced concrete footings, bracing beams, and a galvanized metal support structure for the tank.
- Architectural Work (Building #558): Selective demolition, new steel door, brick partitions, and safety systems.
- Mechanical Works: Provision of a 3,029 m³ (800,000-gallon) elevated cylindrical tank, underground potable water piping, chlorination and pH control dosing system, and associated piping/valves.
- Electrical Works: Underground electrical distribution, interior/exterior lighting, lightning protection, 10 kVA transformer, and a cathodic protection system for the tank interior.
- Miscellaneous Works: Provision of a SCADA control system for the new tank, coordination with existing systems, repairs, cleaning, and testing of all installed equipment.
Contract Details
- Contract Type: Firm Fixed Price.
- Period of Performance: 720 calendar days from the Notice to Proceed.
- Estimated Magnitude: $1,000,000 - $5,000,000 USD.
- Set-Aside/Restriction: This solicitation is intended only for local sources normally resident, licensed, and registered to conduct construction business in Spain. Offers from non-local sources will not be considered.
- Compliance: Contractors must meet requirements established by Spanish legislation for government works. Spanish material, labor, and equipment shall be used whenever feasible. A two-year commercial warranty is required.
Key Dates & Submission
- Pre-proposal Conference/Site Visit: April 20, 2026, 1300 local time, Bldg 106. RSVP via email 24 hours prior; escort requests 72 hours prior.
- Questions Due: April 27, 2026.
- Bid Submission Deadline: May 7, 2026, 1100 hours local time.
- Submission Method: Bids must be submitted electronically in CD form with .pdf files. A printed copy is recommended. Hand-carried proposals require advance coordination for base access. Facsimile bids are NOT accepted.
- Bank Guarantee: A Bank Letter of Guarantee is required within ten (10) calendar days after contract award.
- Post Site Visit Clarification: A Q&A document clarifies the location and electrical feeding details for pumps RCL-1 and RCL-2, which are supplied power from electrical panel PCL inside room 103 (refer to drawing EP 101/C6 Power Plan, Building #558).
Evaluation Criteria
Offers will be evaluated based on criteria in Section M, focusing on price and price-related factors for the lowest responsive bidder. Offerors must be registered and active in SAM. Specific Spanish classification certificates are required, and details on key personnel, structural/tank manufacturers, and control system specialists (including experience and project examples) will be assessed.
Important Notes
Offerors must adhere to all requirements in Section L. Nonconforming bids will not be accepted or evaluated. The project requires compliance with the Integrated Natural Resources Management Plan for Moron AB and the Environmental Final Governing Standards for DoD installations in Spain. Contractors must obtain a "BCE Work Clearance Request" (AF Form 103) before starting work and secure security passes for all personnel and vehicles.