CO NP COLM 10(5), GUARDRAIL IMPROVEMENT

SOL #: 6982AF26Q000007Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

CO

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 16, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 7, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Central Federal Lands Division, is soliciting proposals for Guardrail Improvement (Project CO NP COLM 10(5)) at the Colorado National Monument, Mesa County, CO. This project involves guardrail replacement and new installation along Rim Rock Drive. This is a Total Small Business Set-Aside with an estimated value range of $250,000 to $700,000. Quotes are due May 7, 2026, at 2:00 PM local time.

Scope of Work

The project entails guardrail replacement and new installation across approximately 0.27 miles at various sites within the Colorado National Monument. Key tasks include:

  • Removal of existing guardrail, posts, blocks, and end terminals.
  • Installation of new Midwest Guardrail System (MGS) Type 2, Class A, with coated wood posts.
  • Installation of new MGS Type MGS Tangent terminal systems (coated).
  • Replacement of wood posts and blockouts, and removal/resetting of existing barrier elements.
  • Building up portions of the shoulder in three areas, with one area requiring resetting of boulders.
  • Installation of sign systems (wood post), specifically chevrons, as the solar radar flashing speed sign has been removed from the RFQ.
  • Roadway aggregate (Method 2) and temporary traffic control, including plastic fence for staging areas.
  • Minimizing vegetation removal is a requirement, with a designated staging area at the East Overflow Parking lot.

Contract & Timeline

  • Contract Type: Firm Fixed Price.
  • Estimated Value: $250,000 to $700,000.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 237310 (Highway, Street & Bridge Construction) with a $45 million size standard.
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed, with a completion date of August 11, 2026.
  • Technical Questions Deadline: April 22, 2026, 4:00 PM.
  • Quote Due Date: May 7, 2026, 2:00 PM local time.

Submission & Evaluation

  • Submission: Quotes must be submitted electronically to cflcontracts@dot.gov. Required documents include SF-1442, Quote Schedule, and Representations and Certifications.
  • Bid Bond: A bid bond is required, in the form of a firm commitment, for twenty (20%) percent of the bid price or $3,000,000.00, whichever is less. Original bid bonds must be sent to Denise Martinez at Federal Highway Administration, Central Federal Lands Division Office, 12300 W. Dakota Avenue, Lakewood, CO 80228.
  • Evaluation Factors: Award will be made to the responsible offeror whose quotation is most advantageous, considering Price, Technical Approach (Capability/Subcontracting, Key Personnel, Performance Schedule), and Relevant Experience.
  • Eligibility: Offerors must be registered in the System for Award Management (SAM).

Key Updates

  • Amendment A001: Replaced "sheets C-3 through C-18" of the original document. Bidders must acknowledge this amendment in Block 19 of the SF 1442 to prevent bid rejection.
  • Q&A Clarification: The solar radar flashing speed sign listed on SAM.gov has been removed from the RFQ. Bidders should refer to the bid schedule, which specifies chevrons and wood posts for 5 EA.

People

Points of Contact

Jorey DemlPRIMARY
Denise MartinezSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 1, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View