CO NP COLM 10(5), GUARDRAIL IMPROVEMENT

SOL #: 6982AF26Q000007Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

CO

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 16, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 7, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Central Federal Lands Division, is soliciting proposals for Guardrail Improvement at the Colorado National Monument, Mesa County, CO. This project, identified as CO NP COLM 10(5), involves guardrail replacement and new installation. This is a Total Small Business Set-Aside. Quotes are due May 7, 2026, at 2:00 PM local time.

Scope of Work

The project entails guardrail replacement and new installation along Rim Rock Drive, spanning approximately 0.27 miles across various sites within the Colorado National Monument. Key tasks include:

  • Removal of existing guardrail and terminal systems.
  • Installation of new Midwest Guardrail System (MGS) Type 2, Class A, with coated wood posts.
  • Installation of new MGS Type MGS Tangent terminal systems (coated).
  • Replacement of wood posts and blockouts, and removal/resetting of existing barrier elements.
  • Building up portions of the shoulder in three areas, with one area requiring resetting of boulders.
  • Installation of sign systems (wood post) – Note: The original "Sign System (Solar Radar Flashing Speed Sign)" has been removed from the RFQ and replaced with chevrons (5 EA wood posts) as per Q&A clarifications.
  • Roadway aggregate (Method 2) and temporary traffic control. The project references "STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-24" with Special Contract Requirements (SCRs).

Contract Details

  • Contract Type: Firm Fixed Price.
  • Estimated Price Range: $250,000 to $700,000.
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed, with a completion date of August 11, 2026.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 237310 (Highway, Street & Bridge Construction), with a $45 million size standard.
  • Bid Bond: Required, 20% of bid price or $3,000,000, whichever is less.

Submission & Evaluation

  • Quote Due Date: May 7, 2026, 2:00 PM local time.
  • Electronic Submission: Quotes must be submitted electronically to cflcontracts@dot.gov.
  • Bid Bond Submission: Original bid bonds must be sent to Denise Martinez, Contract Specialist, Federal Highway Administration, Central Federal Lands Division Office, 12300 W. Dakota Avenue, Lakewood, CO 80228.
  • Required Documents: SF-1442, Quote Schedule, and Representations and Certifications.
  • Evaluation Factors: Price, Technical Approach (Capability/Subcontracting, Key Personnel, Performance Schedule), and Relevant Experience. Award will be made to the most advantageous offeror.
  • Amendments: Offerors must acknowledge all amendments (A001, A002) in Block 19 of the SF 1442. Amendment A002, posted May 6, 2026, replaced the Wage Determination and page one of A001, and corrected the project number.

Key Updates

Multiple amendments and Q&A documents have been issued. The most recent Amendment A002 (May 6, 2026) updated the Wage Determination and corrected the project number. Q&A documents clarified the removal of the "Sign System (Solar Radar Flashing Speed Sign)" from the RFQ, specifying the use of chevrons (5 EA wood posts) instead, and provided detailed instructions for electronic bid and original bid bond submissions.

People

Points of Contact

Jorey DemlPRIMARY
Denise MartinezSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: May 6, 2026
Version 4
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View