Comanche Park Campground Reconstruction

SOL #: 1240LT26Q0046Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
Black Hills National Forest
CUSTER, SD, 57730, United States

Place of Performance

Custer, SD

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
May 11, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, Black Hills National Forest, is soliciting proposals for the Comanche Park Campground Reconstruction project in Custer, SD. This Total Small Business Set-Aside opportunity involves expanding the campground, significant road and water system upgrades, and replacing facilities. The estimated magnitude of construction is between $1,000,000 and $5,000,000. Proposals are due May 11, 2026, at 12:00 PM Central Time.

Project Scope

The project entails comprehensive improvements to Comanche Park Campground, expanding it from 20 to 34 sites. Key elements include:

  • Campground Expansion & Roadwork: Road modification with curve widening, shaping for drainage, and new surfacing.
  • Site Upgrades: Relocation and upgrade of the Host Site and Volunteer Site with new power, water, and wastewater vaults.
  • Toilet Facilities: Replacement of five original 1965 stick-built toilets with four new pre-cast vault toilets.
  • Water System: Decommissioning the existing pumphouse, installing a new pre-cast concrete treatment building, removing the existing aboveground water storage tank, installing a new below-ground fiberglass water storage tank, and replacing all distribution piping and hydrants.
  • Potential Additions: The project may include new trails connecting the campground to a nearby motorized trail system.

Contract Details & Requirements

  • Contract Type: Anticipated Firm Fixed Price.
  • NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction (Small Business Size Standard: $45M).
  • Period of Performance: 392 days from the Notice to Proceed (NTP), with work commencing approximately 10 days after NTP. The campground operates seasonally from mid-May to mid-September.
  • Special Requirements: Contractors must demonstrate strong communication, experience in campground, general, and road construction. Water system installers require South Dakota licensing, and electricians need a South Dakota Electrical License with state inspection. Contractors are responsible for barriers, travel, and providing executive/onsite superintendent information.
  • Wage Determination: Bidders must adhere to prevailing wage rates and fringes outlined in the General Decision Number for South Dakota Heavy and Highway Construction Projects.

Submission & Evaluation

  • Proposal Due Date: May 11, 2026, 12:00 PM Central Time.
  • Submission Method: Via email to Erick Plamann (erick.plamann@usda.gov).
  • Required Documents: Experience/Past Performance (max 3 pages), Written Technical Approach (2-4 pages) including three similar projects, Attachment 1- SOI, and Signed SF-30 (if applicable).
  • Evaluation Criteria: Proposals will be evaluated using a comparative evaluation methodology based on Experience/Past Performance, Technical Approach, and Price, seeking the best value.

Key Clarifications & Updates (from Amendment A0001 and Q&A)

  • Option Items: All option items have been removed from the contract.
  • Signs: Signs and the road closure gate shown on plan drawing sheet C8.1 are eliminated.
  • Tank Removal: Only the above-ground polyethylene tank removal is required; no underground tank removal.
  • Electrical Service: A new electrical service is required, with the contractor responsible for payments to the power company.
  • Bat Reporting: Contractors must immediately report any dead or injured bats to the Contracting Officer's Representative.
  • Site Visit: An organized site visit was held on April 17, 2026, at 9:00 AM Mountain Time.

People

Points of Contact

Erick PlamannPRIMARY
Lucas DahlmanSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 7, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View