Conservation and Stabilization of the Plaster and Decorative Paint at the President’s Room Ceiling, United States Capitol Building

SOL #: AOCSSB26R0023Solicitation

Overview

Buyer

Architect Of The Capitol
Architect Of The Capitol
ACQUISITION & MATERIAL MAN. DIV.
Washington, DC, 20515, United States

Place of Performance

Washington, DC

NAICS

All Other Professional (541990)

PSC

Other Professional Services (R499)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 12, 2026
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Apr 20, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Architect of the Capitol (AOC) is seeking proposals for the Conservation and Stabilization of the Plaster and Decorative Paint at the President’s Room Ceiling, S-216, United States Capitol Building. This solicitation, RFP # AOCSSB26R0023, aims to award one contract to an Architectural Conservation (AC) Firm. Proposals are due April 20, 2026, at 2:00 PM EDT.

Opportunity Details

This opportunity focuses on preserving a significant historical architectural feature within the U.S. Capitol. The selected contractor will provide design services, develop a comprehensive treatment plan, and implement conservation and stabilization efforts for the plaster ceiling and decorative paint finishes. The work addresses issues identified in detailed condition assessments, including significant plaster detachment, flaking paint, and efflorescence.

Scope of Work

The scope includes:

  • Reviewing existing documentation and conducting current condition surveys.
  • Performing additional paint sampling and exposures.
  • Identifying materials and methods for plaster consolidation/stabilization and protecting finishes.
  • Developing and testing mock-ups for proposed treatments.
  • Executing stabilization of the plaster ceiling and conservation of decorative paint finishes.
  • Cleaning, localized consolidation, and in-situ testing.
  • Preparing an illustrated written completion report. Special requirements include compliance with hazardous materials (asbestos, lead, crystalline silica) regulations, submission of a Safety Work Plan and Quality Control Program, and the use of key personnel with specific experience in plaster and paint conservation.

Contract & Timeline

  • Contract Type: Firm-Fixed Price for the base treatment plan and engineering services, with an Unpriced Option for implementation based on Time & Material rates.
  • NAICS Code: 541990 (Other Professional Services).
  • Set-Aside: None; this is an open competition for all businesses registered in SAM.
  • Period of Performance: A 6-month base period (180 calendar days) from award (expected to be from August 17, 2026, to February 16, 2027) for the treatment plan, with a 16-month option (480 calendar days) for implementation, targeting completion by June 30, 2028. The total potential term is up to 22 months.
  • Place of Performance: Primarily the U.S. Capitol Building, Washington, D.C., with some work potentially at the contractor's facilities.

Key Dates

  • Non-Mandatory Site Visit: Tuesday, April 7, 2026, 1:00 PM EDT (Registration required by April 1st).
  • Questions Due: Wednesday, April 8, 2026, 4:00 PM EDT.
  • Proposals Due: Monday, April 20, 2026, 2:00 PM EDT.
  • Past Performance Questionnaires Due: April 20, 2026, 2:00 PM ET (submitted directly by past clients).

Evaluation Factors

Award will be made to the responsible offeror providing the overall best value to the AOC, utilizing a Tradeoff Process. Technical factors, including Corporate Experience, Technical Approach, Key Personnel, and Past Performance, are significantly more important than Price. Proposals must be submitted in two volumes: Technical and Price.

Submission Requirements

Offerors must use the provided Pricing Proposal spreadsheet (J.3). Required attachments include a Certificate of Liability Insurance (J.12) listing the AOC as an additional insured, and compliance with various forms for personnel eligibility (J.10, J.11). Detailed technical reports (J.4, J.5, J.6) provide critical background on the ceiling's condition and should be reviewed.

People

Points of Contact

Troy Dorsey, Contracting OfficerPRIMARY
Lily Najera, Contract SpecialistSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Mar 16, 2026
Version 2
Pre-Solicitation
Posted: Mar 16, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 12, 2026
View
Conservation and Stabilization of the Plaster and Decorative Paint at the President’s Room Ceiling, United States Capitol Building | GovScope