Construct Redundant Electrical Supply, Buckley SFB, CO

SOL #: W9128F24R0066Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W071 ENDIST OMAHA
OMAHA, NE, 68102-4901, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jul 17, 2024
2
Last Updated
Feb 13, 2025
3
Submission Deadline
Aug 20, 2024, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 10
Solicitation
Posted: Feb 13, 2025
View
Version 9
Solicitation
Posted: Jan 30, 2025
View
Version 8
Solicitation
Posted: Dec 30, 2024
View
Version 7
Solicitation
Posted: Nov 26, 2024
View
Version 6
Solicitation
Posted: Oct 30, 2024
View
Version 5
Solicitation
Posted: Sep 13, 2024
View
Version 4
Solicitation
Posted: Aug 29, 2024
View
Version 3
Solicitation
Posted: Aug 13, 2024
View
Version 2
Solicitation
Posted: Jul 30, 2024
View
Version 1Viewing
Solicitation
Posted: Jul 17, 2024