Construct Redundant Electrical Supply, Buckley SFB, CO
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
AM-0003 - Updated Drawings/Specifications and Revised Proposal Due Date // AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area