Cristobal Colon Earthwork Improvement Materials - Gravel

SOL #: W912CL26QA012Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
0410 AQ HQ CONTRACT
FORT SAM HOUSTON, TX, 78234-5046, United States

Place of Performance

Cristobal Colon, PA-3, Panama

NAICS

Brick (423320)

PSC

Mineral Construction Materials, Bulk (5610)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
Apr 15, 2026
3
Submission Deadline
Apr 20, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting proposals for Cristobal Colon Earthwork Improvement Materials, specifically gravel, geotextile fabric, silt fencing, and drainage supplies, to support the Jungle Operations Training Center (JOTC) at Base Aeronaval Cristobal Colon, Panama. This is an Unrestricted solicitation for a Firm Fixed-Price contract. Offers are due by April 20, 2026, at 10:00 AM Central Daylight Time.

Scope of Work

The contractor will be responsible for the transportation and delivery of materials to three construction sites in Cristobal Colon, Panama. Installation and placement will be performed by U.S. personnel. Key materials include:

  • 5,183 cubic yards of 3/4"-0 angular crushed stone.
  • 206,600 square feet of woven geotextile material.
  • 2,050 linear feet of wire-backed silt fencing.
  • Drainage supplies (non-woven geotextile, drainage rock aggregate, perforated HDPE pipe, and couplings) under CLIN 0004. Materials must meet U.S. Government standards, including UFGS 32 11 23 for aggregate and UFGS 31 05 19.13 for geotextiles. The contractor must comply with Panamanian regulations and provide material certifications.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Set-Aside: Unrestricted
  • NAICS Code: 423320 (Wholesale Trade - Durable Goods Merchant Wholesalers)
  • Product Service Code: 5680 (Mineral Construction Materials, Bulk)
  • Place of Performance: Base Aeronaval Cristobal Colon, Panama
  • Period of Performance: Delivery of woven geotextile and silt fence is required no later than May 13, 2026 (completion by May 15, 2026). Aggregate material delivery begins on or about May 20, 2026, and ends May 29, 2026.

Submission & Evaluation

Offers will be evaluated based on Technical and Price factors, with award made to the lowest priced, technically acceptable offer. A separate Technical Plan is required, detailing the approach for sourcing, acquiring, and delivering supplies, including supply specifications and a delivery plan. Offerors must submit quotes in English, in U.S. Dollars, on SF1449.

  • Questions Due: April 13, 2026, 2:00 PM Central Daylight Time.
  • Offer Due Date: April 20, 2026, 10:00 AM Central Daylight Time.
  • Acknowledgement: Offerors must acknowledge all amendments by submitting a signed SF30.

Additional Notes

This solicitation (W912CL26QA012) has been amended multiple times. Amendment 0001 added drainage materials (CLIN 0004), updated the SOW, and extended the response due date. Amendment 0002 provided responses to remaining questions and attachments, confirming no further extension to the closing date. A pre-quote site visit was scheduled for April 17, 2026, at Fort Sherman. Contacts are Nathanial D. Gaunt (nathanial.d.gaunt.civ@army.mil) and MAJ Vernon Shank (vernon.d.shank.mil@army.mil).

People

Points of Contact

Nathanial D. GauntPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Apr 15, 2026
Version 3
Solicitation
Posted: Apr 9, 2026
View
Version 2
Solicitation
Posted: Apr 7, 2026
View
Version 1
Solicitation
Posted: Apr 2, 2026
View