Dam Valve Replacement/Repair for the Hoosier National Forest
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is seeking proposals for Dam Valve Replacement/Repair services for three earthen dams within the Hoosier National Forest, Tell City Ranger District, Indiana. This is a Total Small Business Set-Aside opportunity. The project involves replacing valve assemblies at Celina Lake and Saddle Lake dams, and repairing the assembly at the U-38 dam. Proposals are due March 20, 2026, at 5:00 PM EST.
Scope of Work
The scope includes the replacement of existing gate and lift assemblies at Celina Lake and Saddle Lake dams with Hydro Gate gates and CPS series lift assemblies (or approved alternatives). For the U-38 dam, the work involves re-securing the valve lift-stem system that has come loose from the inlet structure wall. All work within inlet structures is considered permit-required confined space, requiring certified personnel adhering to OSHA 29 CFR 1910 regulations. The valves for Celina and Saddle Lake dams are in wet chambers.
Contract Details
- Contract Type: Combined Synopsis/Solicitation (RFQ) for a Firm Fixed-Price contract.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 237990 (Small Business Size Standard: $45.0M).
- Period of Performance: Anticipated April 1, 2026 – September 1, 2026.
- Place of Performance: Bristow, IN (Hoosier National Forest).
Submission & Evaluation
- Offer Submission: Via email to Michael.Wheelock@usda.gov.
- Submission Deadline: March 20, 2026, at 5:00 PM EST.
- Required Submissions: Technical proposal, price proposal, and contractor representations and certifications.
- Evaluation Factors (Descending Importance): Technical Capability, Past Performance, Management Plan, and Cost/Price. The government may perform a comparative evaluation for best value.
- Eligibility: Offerors must have an active SAM registration.
Key Clarifications & Notes
- Site Visits: Can be arranged on March 10th, 12th, or 13th.
- As-Built Drawings: Available for Celina and Saddle locations upon request; not available for U-38. Scanned hardcopies from the 1960s are very large files.
- Technical Questions: Must be submitted through the SAM.gov listed primary POC to ensure all interested parties receive answers.
- Lake Drawdown: The lake may be drawn down below the primary inlet elevation but will not be emptied.
- Ground Conditions: Do not need to be dry for access via the dam crest, but the contractor is responsible for repairing any damage to Forest Service property.
- Attachments: Include detailed specifications for Celina, Saddle, and U-38 valves, a Statement of Work, Wage Determination, and an Experience Questionnaire (FS-6300-27) which must be completed.
Contact Information
- Primary Point of Contact: Jordan Wheelock, Michael.Wheelock@usda.gov, 812-276-4730.