Daugherty Wetland Restoration Project Clark County, Illinois

SOL #: 12FPC326Q0014Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Farm Production And Conservation Business Center
FPAC BUS CNTR-ACQ DIV
WASHINGTON, DC, 20250, United States

Place of Performance

Martinsville, IL

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 27, 2026
2
Submission Deadline
May 19, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Department of Agriculture (USDA) - Natural Resources Conservation Service (NRCS) in Illinois has issued a Combined Synopsis/Solicitation for the Daugherty Wetland Restoration Project in Clark County, Illinois. This project, designated as a Total Small Business Set-Aside, involves significant earthwork for wetland creation and habitat improvement. Offers are due by May 19, 2026, at 2:00 PM CT.

Scope of Work

The project focuses on wetland restoration activities, including:

  • Excavation of pools, tile exploration, and habitat mounds.
  • Mobilization and demobilization of contractor forces and equipment.
  • Excavation and disposal of materials, with an estimated quantity of 20,943 cubic yards of common excavation.
  • Furnishing and placing seed in designated areas.
  • Work must adhere to Construction Specification 21—Excavation, detailing classifications, material handling, safety, and measurement. Detailed construction drawings provide specific dimensions and layouts for all proposed features.

Contract Details

  • Type: Combined Synopsis/Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Performance Period: 37 days (from bid schedule)
  • Place of Performance: Martinsville, IL 62442
  • Wage Determination: Bidders must comply with U.S. Department of Labor Wage and Hour Division General Decision IL20260015, effective 01/02/2026, which sets prevailing wage rates for construction trades in Clark County, IL.

Submission & Deadlines

  • Offers Due: May 19, 2026, 2:00 PM CT
  • Site Visit: A recommended site visit will be held on May 5, 2026, at 10:00 AM CT at the USDA/NRCS Service Center, 1001 N. York Street, Martinsville, IL 62442. Contact Matt Dassenbrock at matt.dassenbrock@usda.gov or (217)208-4020 for site visit details.
  • Questions Due: All questions must be submitted in writing to Bobby Copenny II at bobby.copenny@usda.gov no later than May 12, 2026, 2:00 PM CT.

Point of Contact

Bobby Copenny, Contract Specialist, Bobby.Copenny@usda.gov, (817) 509-3503.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
Daugherty Wetland Restoration Project Clark County, Illinois | GovScope