Demolition Services B15 and B54

SOL #: FA309926Q0008Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3099 47 CONF CC
LAUGHLIN AFB, TX, 78843-5101, United States

Place of Performance

Laughlin AFB, TX

NAICS

Site Preparation Contractors (238910)

PSC

Demolition Of Buildings (P400)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
Apr 30, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The 47th Contracting Squadron at Laughlin Air Force Base, TX, has issued a Solicitation for Demolition Services for two buildings, Building 15 (Aircraft Maintenance) and Building 54 (Aircraft Shop). This is a Total Small Business Set-Aside opportunity. The project involves complete demolition, utility disconnection, debris removal, and site restoration. Proposals are due by April 30, 2026, at 3:00 p.m. CDT.

Scope of Work

The contractor will provide all materials, labor, tools, equipment, and transportation for the complete demolition of Building 15 (approx. 815 sq ft) and Building 54 (approx. 358 sq ft). Key tasks include:

  • Complete demolition of structures, including specific elements like the northern metal pavilion (B15) and associated concrete foundations, railroad ties, decorative rock, and landscaping items.
  • Proper disconnection and capping of all associated utilities (e.g., water lines capped 5 feet from slab, coordination with Rio Grand Electric Cooperative for electrical).
  • Removal and disposal of all debris, including Fire Alarm and Data Equipment, with hazardous materials testing required for lead paint, asbestos, PFAS, and PFOA.
  • Complete site restoration, including backfilling, grading, seeding (with 14 days of watering), and installation of new security fencing (refer to RFI Attachment for specifications).
  • Adherence to strict safety and security protocols due to proximity to an active airfield, including Airfield Driving Training, FOD plans, and specific Entry Control Points (ECP 1 for B15, ECP 2 for B54).
  • Compliance with Laughlin AFB Environmental Quality Construction Specifications and Division 01 General Specification Guidelines for Construction Projects.

Contract Details

  • Contract Type: Firm-Fixed Price, commercial acquisition under FAR Part 12.
  • Period of Performance: Total of 126 calendar days (91 days for submittals, 35 days for demolition), subject to adjustment.
  • Place of Performance: Laughlin Air Force Base, TX.
  • Product Service Code: P400 (Demolition Of Buildings).
  • NAICS: 238910 (Site Preparation Contractors) with a size standard of $19M.
  • Wage Determination: Wage Determination No. 2015-5303 (Revision 30) for Texas counties applies.

Submission & Evaluation

  • Proposals Due: April 30, 2026, 3:00 p.m. CDT. Quotes must be submitted electronically via email.
  • Evaluation Criteria: Award will be based on Price (most important), Technical, and Past Performance.
  • Amendments: Amendment 0001 has been issued, adding Solicitation Questions and Answers (Q&A) and an RFI Attachment. Offerors must acknowledge receipt of all amendments.

Special Requirements & Notes

  • A pre-award site visit was scheduled for April 22, 2026.
  • For Controlled Unclassified Information (CUI) attachments (e.g., B15/B54 Floor Plans, Utilities, Aerials), contact the Contracting Officer or Contract Specialist directly for access or request access in SAM.
  • A comprehensive Schedule of Submittals is required, covering pre-construction and construction phases.

Contact Information

People

Points of Contact

SrA Brayden GarnerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: Apr 29, 2026
View
Version 2Viewing
Solicitation
Posted: Apr 28, 2026
Version 1
Solicitation
Posted: Apr 13, 2026
View