Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP)

SOL #: W911S226RA003Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC-FT DRUM
FORT DRUM, NY, 13602-5220, United States

Place of Performance

Kingsport, TN

NAICS

Engineering Services (541330)

PSC

Architect And Engineering Construction: Ammunition Facilities (C1EA)

Set Aside

No set aside specified

Timeline

1
Posted
Jul 30, 2025
2
Last Updated
Dec 3, 2025
3
Submission Deadline
Dec 19, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This is an A-E Synopsis in accordance with FAR 36.6. The Mission and Installation Contracting Command ? Fort Drum is procuring Architect?Engineer (A E) Design Services for the development of a new Lacquer Preparation Facility and Chemical Storage Tank Farm at Holston Army Ammunition Plant (HSAAP), Kingsport, TN. This procurement is conducted under the Brooks Architect?Engineer Act (40 U.S.C. Section 1102) and FAR Subpart 36.6, which require that A E contracts be negotiated on the basis of demonstrated competence and qualifications for the required professional services. The facility will support production of plastic bonded explosives (PBX) and is critical to expanding the Department of Defense?s energetic materials manufacturing capacity.

People

Points of Contact

Files

Files

Download
Download
View
View
View
View

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Dec 3, 2025
Version 2
Combined Synopsis/Solicitation
Posted: Sep 19, 2025
View
Version 1
Sources Sought
Posted: Jul 30, 2025
View
Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP) | GovScope