Design/Build B562 MAU#1 Replacement

SOL #: ACQR6148962Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Groton, CT

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 3, 2026
2
Last Updated
Apr 15, 2026
3
Submission Deadline
Apr 29, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for a Design/Build project to replace two existing Makeup Air Units (MAU) in Building B562 at Naval Submarine Base New London, Groton, CT. This effort aims to upgrade outdated HVAC infrastructure, improve air quality, and ensure dehumidification. Proposals are due April 29, 2026, at 12:00 PM EST.

Scope of Work

This Design-Build project involves the replacement of two 26-year-old Makeup Air Units (MAUs) that lack dehumidification and have unavailable parts. The new units must match existing capacities, include dehumidification to 50% RH +/- 10%, and be energy-efficient and cost-effective. Innovative solutions like Dedicated Outdoor Air Units (DOAS) are permitted. The scope includes:

  • Design, provision, and installation of MAU#1 (Base Bid).
  • Design only for MAU#2 (Base Bid), with provision and installation as Option 1.
  • Demolition of existing Horizontal Dehumidifier Fancoil Units (FC-1/2) and Air Cooled Condensing Units (CND-1/2).
  • Integration of new MAU controls with the existing building DDC system.
  • Installation of additional utilities (electrical, disconnect, piping, gas).
  • Compliance with environmental regulations, particularly concerning a potential PFAS area.

Contract & Timeline

  • Contract Type: Solicitation for a Design-Build project under an Indefinite Delivery / Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC).
  • Magnitude: Between $250,000 and $500,000.
  • Period of Performance: 210 calendar days after contract award.
  • PSC Code: Y1JZ (Construction Of Miscellaneous Buildings).
  • Proposal Due: April 29, 2026, 12:00 PM EST.
  • Published: April 15, 2026.

Eligibility & Submission

This solicitation is restricted to MACC holders only (ML-C00073). Limitations on subcontracting apply, requiring 85% for general construction and 75% for special trade contractors. Proposals must be submitted electronically via email to shawn.a.drake3.civ@us.navy.mil. Evaluation will be based on the lowest evaluated price.

Key Considerations

Bidders must account for detailed electrical infrastructure information, including panel images, circuit directories, and recent metering data (NEC220.87 reports) provided in amendments, which are crucial for assessing power requirements and planning electrical upgrades. General contract requirements for Naval Submarine Base New London include strict compliance with base regulations, fire protection, safety protocols (COE EM-385, no emergency medical services on base), mandatory RADCON drills, environmental protection, insurance, and security (DBIDS). Prevailing wage rates (Davis-Bacon Act) for New London County, CT, apply, and bidders should utilize the Connecticut sales and use tax exemption (CERT-141).

People

Points of Contact

Shawn DrakePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: Apr 15, 2026
Version 5
Solicitation
Posted: Mar 23, 2026
View
Version 4
Solicitation
Posted: Mar 11, 2026
View
Version 3
Solicitation
Posted: Mar 5, 2026
View
Version 2
Solicitation
Posted: Feb 27, 2026
View
Version 1
Solicitation
Posted: Feb 3, 2026
View
Design/Build B562 MAU#1 Replacement | GovScope