Double Chamber Forging Furnace

SOL #: W519TC26QA116Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RI
ROCK ISLAND, IL, 61299-0000, United States

Place of Performance

IL

NAICS

Industrial Process Furnace and Oven Manufacturing (333994)

PSC

Metal Heat Treating And Non Thermal Treating Equipment (3424)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
Apr 13, 2026
3
Submission Deadline
Apr 28, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting proposals for a Double Chamber Forging Furnace for the Rock Island Arsenal Joint Manufacturing & Technology Center (RIA-JMTC) in Illinois. This is a Total Small Business Set-Aside acquisition, structured as a Firm Fixed Price (FFP) contract. Award will be based on a Lowest Price Technically Acceptable (LPTA) evaluation. Proposals are due April 28, 2026, at 10:00 AM CT.

Scope of Work

The contractor shall provide, install, and ensure operational readiness of a front-loading, double-chamber, two-door, stationary, electrically powered billet furnace. Key requirements include:

  • Capacity: Capable of heating 12 billets (4-inch diameter, 12-inch long, 50 lbs each) from room temperature to 2300°F in a maximum of 40 minutes.
  • Temperature: Work zone temperature range of 1800°F - 2300°F with a maximum variance of +/- 25°F, and a maximum temperature capability of at least 2500°F.
  • Compliance: Must comply with SAE AMS 2750H (Class 5 or better, Type D instrumentation) and NFPA 86 (Class A ovens).
  • Controls: Allen Bradley MicroLogix PLC (most current model) with a 10-inch color touch-screen HMI and SSI 9205 Master Controller.
  • Installation: Contractor is responsible for all installation, setup, and connections beyond the point of first utility connection. Site inspections prior to bidding are highly recommended.
  • Training: Provide comprehensive training for operators, programmers, maintenance, and methods personnel at RIA-JMTC.
  • Service: Verifiable service/repair capability with a 48-hour on-site response time.
  • Documentation: Deliver a complete Contract Data Requirements List (CDRL) package, including installation documentation, schematics, maintenance manuals, operator manuals, and environmental compliance data.
  • Unique Identification (UID): Equipment must comply with UID registration requirements.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 333994 (Metal Heat Treating And Non Thermal Treating Equipment), Size Standard: 500 employees.
  • Delivery: FOB Destination to Rock Island Arsenal, IL, 61299-5000, by November 12, 2026. Early delivery is acceptable.
  • Proposal Due: April 28, 2026, 10:00 AM CT.
  • Published Date: April 13, 2026.

Evaluation

Award will be made using a Lowest Price Technically Acceptable (LPTA) process. Proposals will first be evaluated on an ACCEPTABLE/UNACCEPTABLE basis for the Technical factor, then by Price.

  • Technical Factor (ACCEPTABLE/UNACCEPTABLE):
    • Experience: Minimum 3 years supplying similar equipment, supported by published data and at least three references.
    • Technical Compliance: Submission of a compliance statement against the RIPD, equipment identification, and a minimum 1-year parts and labor warranty.
  • The Government intends to award without discussions, except for clarifications.

Additional Notes

Strict security requirements apply for access to Rock Island Arsenal, including background checks. Payment will be processed via Wide Area WorkFlow (WAWF). The primary point of contact is John Jacobsen.

People

Points of Contact

JOHN JACOBSENPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Apr 13, 2026
Version 2
Solicitation
Posted: Apr 7, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 2, 2026
View