DRYDOCK: USCGC COBIA DD FY26

SOL #: 70Z08026QPBPL0019Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 1(00080)
NORFOLK, VA, 23510, United States

Place of Performance

Place of performance not available

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (East) Ship Repair (Including Overhauls And Conversions) Performed On Non Nuclear Propelled And Nonpropelled Ships East Of The 108th Meridian (J998)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 5, 2026
2
Last Updated
Jan 29, 2026
3
Submission Deadline
Feb 6, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) is soliciting proposals for drydock repairs and maintenance for the USCGC COBIA (WPB 87311) during FY2026. This opportunity is designated as a Total Small Business Set-Aside. Proposals are due February 6, 2026.

Opportunity Overview

This combined synopsis/solicitation (RFQ 70Z08026QPBPL0019) seeks a contractor to perform comprehensive drydock repairs for the USCGC COBIA (WPB 87311), which is located at 1700 Thomas Dr., Panama City Beach, FL 32408. The effort is managed by the SFLC Procurement Branch 1.

Scope of Work

The extensive scope of work, detailed in the Statement of Work, includes structural analysis (utilizing 3D laser scanning), hull plating inspection and preservation, cleaning and inspection of various tanks (dirty oil, oily water, fuel, grey water, sewage), renewal of propulsion shafts, propellers, rudder assemblies, and bearings, and maintenance of sea water and HVAC systems. Additional tasks involve electrical system thermographic inspection, replacement of the Intrusion Detection System and Fire Alarm Control Panel, and renewal of cathodic protection/zinc anodes. The contractor must provide a facility accessible from a navigable waterway with a minimum water depth of 12 feet and a minimum height clearance of 55 feet. Adherence to SFLC Standard Specifications, personnel qualifications, and strict environmental and safety protocols are mandatory.

Contract Details

This will be a Firm Fixed Price contract. The Period of Performance is scheduled from April 21, 2026, to June 24, 2026. Evaluation will be based on Technical Capability, Past Performance, and Price, with Technical Capability and Past Performance considered significantly more important than price. Funds are not presently available, and any award is contingent upon fund availability.

Submission Requirements

Quotations must be submitted electronically via email by February 6, 2026, at 5:00 PM EST. Submissions must include a Cover Letter, Price Schedule, Past Performance Submission, and Technical Capability Submission. Offers must remain firm for 90 calendar days from the receipt date. The deadline for requesting drawings was January 16, 2026, and site visits were to be completed by January 23, 2026.

Key Clarifications (from Amendment 0001)

Clarifications indicate that the mast cannot be lowered but can be removed via crane. The air draft from the waterline to the top of the pilothouse is approximately 25.5 feet, with instruments extending higher. The total height from the top of the pilothouse to the antenna foundation is about 20.5 feet (excluding the antenna). The cutter will be drydocked in position 2. These clarifications do not impact submission requirements or deadlines.

Contact Information

Primary contact is Kurt Hoyer at kurt.e.hoyer@uscg.mil or 304-694-3603. Secondary contact is Jaime R. Smith at Jaime.R.Smith@uscg.mil or 571-607-5000.

People

Points of Contact

Jaime R. SmithSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jan 29, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 5, 2026
View
DRYDOCK: USCGC COBIA DD FY26 | GovScope