DSCR - Elk Pasture - Dry Swale 3 Project

SOL #: SP470326Q0026Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DCSO RICHMOND DIVISION #1
RICHMOND, VA, 23237, United States

Place of Performance

Richmond, VA

NAICS

Site Preparation Contractors (238910)

PSC

Site Preparation (F021)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 17, 2026
2
Submission Deadline
Apr 17, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA), through its DCSO Richmond Division #1, is soliciting quotes for the DSCR - Elk Pasture - Dry Swale 3 Project at the Defense Supply Center Richmond, VA. This is a Combined Synopsis/Solicitation (RFQ SP470326Q0026) for commercially available services, with an estimated magnitude between $125,000 and $175,000. Award will be made to the Lowest Priced Technically Acceptable (LPTA) offeror.

Scope of Work

The project's objective is to construct the Dry Swale 3 stormwater management facility within the Elk Pasture area of DSCR. This facility will provide sediment and nutrient removal for stormwater runoff, ensuring compliance with Virginia DEQ and EPA watershed implementation plans. The contractor's scope includes:

  • Construction of a concrete weir wall.
  • Installation of the underdrain system section located under the concrete wall (DSCR provides pipe).
  • Installation of a new chain link fence around the Dry Swale 3 site, matching DSCR standards (assumed 8-foot, to be verified).
  • Implementation of erosion and sediment control measures, including silt fence installation (DSCR provides material) and protection of storm drain inlets. The work must adhere to the attached 2021-09-03 Elk Pasture 100% Site Plans.

Contract Details & Eligibility

  • Contract Type: Firm-Fixed-Price.
  • Period of Performance: 60 days from the issuance of a notice to proceed.
  • Set-Aside: This acquisition is a 100% Total Small Business Set-Aside.
  • NAICS Code: 238910 (SITE PREPARATION CONTRACTORS) with a $19M size standard.
  • Wage Determination: Department of Labor Wage Determination for Chesterfield County, VA, applies.
  • Location Requirement: Offerors must possess a bona fide place of business within 125 miles of DSCR, maintaining an office with at least one full-time employee.
  • Contractor Qualifications: Minimum of five years of relevant experience in similar projects, expertise in stormwater management facilities (earthwork, grading, underground utilities, underdrain systems, reinforced concrete), familiarity with Virginia DEQ, DoD construction standards, and Unified Facilities Criteria (UFC). Personnel must be OSHA-certified and capable of obtaining base access clearance. Valid insurance and three verifiable references with contract numbers are required.

Key Dates & Submission

  • Site Visit: April 2, 2026, at 10:00 AM. Interested parties must register via DBIDS and email QR codes to Project Manager Rob Miller (robert.c.miller@dla.mil) at least 5 business days prior for security vetting.
  • Deadline for Questions: Close of Business (COB) April 6, 2026. Submit questions via email to Contracting Officer Robert Moragues (Robert.Moragues@dla.mil).
  • Quote Due Date: Close of Business (COB) April 17, 2026.
  • Submission Method: Email quotes to Contracting Officer Robert Moragues (Robert.Moragues@dla.mil).
  • Partial proposals will not be accepted.

People

Points of Contact

Robert Moragues, Contracting OfficerPRIMARY
Kyle Gregory, Contracting OfficerSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
DSCR - Elk Pasture - Dry Swale 3 Project | GovScope