Z--Eisenhower National Historic Site

SOL #: 140P4226Q0005Solicitation

Overview

Buyer

Interior
National Park Service
NER SERVICES MABO (43000)
BOSTON, MA, 02108, United States

Place of Performance

Place of performance not available

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Last Updated
Feb 19, 2026
3
Submission Deadline
Mar 19, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), specifically the NER SERVICES MABO (43000) office under the Department of the Interior, is soliciting proposals for fire suppression system repairs at the Eisenhower National Historic Site in Gettysburg, PA. This project, titled "Z--Eisenhower National Historic Site," involves major repairs and replacement of dry pipe fire suppression systems in the Farm 1 Bank Barn, Farm 2 Show Barn, and the Guest House on Farm One. This is a Total Small Business Set-Aside (FAR 19.5). Proposals are due March 19, 2026, at 5:00 PM ET.

Scope of Work

The primary objective is the demolition and replacement of fire sprinkler system components to address core deficiencies and ensure compliance with local codes and agency regulations. Key tasks include:

  • Farm 1 Main Barn: Complete replacement of the existing dry system in the basement; demolition of the second-floor system.
  • Farm 2 Show Barn: Demolition of existing galvanized sprinkler mains and installation of new dry system valves, VPS, and associated piping.
  • Guest House on Farm One: Replacement of existing sprinkler heads to prevent freezing.
  • Installation must comply with the 2022 Edition of NFPA 13.
  • The project also includes construction of roof replacement and various exterior repairs, as well as the replacement of air compressors with nitrogen generator systems.

Contract Details

  • Contract Type: Single Firm-Fixed Price contract.
  • Estimated Magnitude: Between $100,000 and $250,000.
  • Period of Performance: April 1, 2026, to September 30, 2026.
  • Product Service Code: Z2AZ (Repair Or Alteration Of Other Administrative Facilities And Service Buildings).
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a $19M size standard.
  • Wage Determination: Bidders must adhere to prevailing wage rates for Adams County, PA (General Decision Number PA20260073).
  • Subcontracting: Compliance with FAR Clause 52.219-14 is required, ensuring the prime contractor or similarly situated entities perform a minimum of 25% of the work (excluding materials).

Submission & Evaluation

  • Proposal Submission: Electronic via email to wendy_deleon@nps.gov. Specific formatting and content requirements are detailed in the solicitation.
  • Key Deadlines:
    • Site Visit: Wednesday, March 4, 2026, at 1:00 PM ET. (Point of contact: Brendan Middaugh, brendan_middaugh@nps.gov; Wendy DeLeon, wendy_deleon@nps.gov).
    • Pre-proposal Questions Due: Minimum of 7 days prior to the proposal due date.
    • Quote Due Date: March 19, 2026, at 5:00 PM ET.
  • Evaluation Factors:
    • Factor 1: Technical Capability (approach, realism, schedule).
    • Factor 2: Project Experience (relevant projects, urban setting experience, project management).
    • Price Evaluation.
  • Award Basis: Lowest Price Technically Acceptable (LPTA).

Additional Notes

Attachments include the Statement of Work (SOW), Specifications, Drawings, Wage Determination, Subcontracting Percentage Worksheet, and a Q&A Document which clarifies wiring type (copper AWG 12). The contractor is responsible for obtaining all necessary permits and approvals and ensuring compliance with OSHA guidelines and NFPA regulations. A 1-year warranty is required for all newly installed systems.

People

Points of Contact

De Leon, WendyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Feb 19, 2026
Version 1
Solicitation
Posted: Feb 19, 2026
View