Electric Meter Installation

SOL #: FA480326R0017Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4803 20 CONS LGCA
SHAW AFB, SC, 29152-5125, United States

Place of Performance

Charleston AFB, SC

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
May 5, 2026
3
Submission Deadline
May 4, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 20 CONS LGCA, is soliciting proposals for Electric Meter Installation at Shaw Air Force Base, SC. This Total Small Business Set-Aside opportunity requires the replacement of existing electric meters with new government-furnished smart meters and associated Current Transformers (CTs) in 40 buildings. The estimated project magnitude is between $100,000 and $250,000. Proposals are due May 4, 2026, at 2:00 PM EST.

Scope of Work

The project, titled "Replace Electric Meters," involves providing all labor, materials, equipment, permits, and transportation necessary for the complete installation of new Schneider PowerLogic PM8000 smart electric meters and CTs. This includes the demolition and removal of existing non-functional meters and CTs. Installations must occur in building mechanical rooms, adjacent to main power distribution panels, and require verification of electrical characteristics. All work must comply with state, federal, industry standards, and the Shaw AFB Design and Construction Standards.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: Not to exceed 90 days after issuance of Notice to Proceed.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5) for NAICS 238210 (Electrical Contractors), with a size standard of $19,000,000.00.
  • Bonds: Performance and Payment Bonds may be required at the Contracting Officer's discretion, regardless of bid amount.

Key Requirements & Deliverables

  • Install new PM8000 smart meters and CTs in 40 buildings, ensuring full operational capability for electrical usage monitoring.
  • Coordinate all power outages with the 20 CES Project Inspector three weeks in advance.
  • Obtain necessary dig permits; electrical permits with state/city are not required.
  • Provide submittals for CT cutsheets, as-built documentation (floor plans, MAC address, serial number), and daily reports in RAKEN format.
  • A minimum one-year warranty against defects in material and workmanship is required.
  • The Prime Contractor is expected to self-perform in accordance with FAR 52.219-14, and a competent on-site project superintendent is mandatory.
  • Adherence to Davis-Bacon Act wage rates for Sumter County, SC, is required.

Submission & Evaluation

Proposals will be evaluated on a Lowest Priced, Technically Acceptable (LPTA) basis. Submissions must include a signed SF 1442, a detailed Pricing Breakdown Sheet (Attachment 2), a Bid Schedule (Attachment 3), and a Technical Proposal (maximum 10 pages) with an Explanation of Estimate. Proposals should be submitted electronically via email to the Contracting Officer and Contract Specialist. Offerors are encouraged to submit their best proposal initially, as discussions may not be held.

Important Dates & Actions

  • Mandatory Site Visit: April 14, 2026, at 10:00 AM on Shaw AFB. Base access requests must be coordinated with Ms. Zelda Williams or Ms. Sarah Nieves by April 6, 2026, 2:00 PM EST, using the Base Access Request form (Attachment 11). Personal Protective Equipment (PPE) is required.
  • Questions Due: April 20, 2026, 10:00 AM EST.
  • Answers Posted: April 23, 2026, 10:00 AM EST.
  • Proposals Due: May 4, 2026, 2:00 PM EST.

Amendments & Clarifications

  • Amendment 0001 (April 15, 2026): Updated Attachment 5 (Building List and Electrical Data) to include special notes on transformer locations and potential weekend work requirements.
  • Amendment 0002 (April 22, 2026): Added Attachment 13, "Replace Electric Meters Questions and Answers," clarifying bond requirements, submission methods, and permit needs.
  • Amendment 0003 (April 30, 2026): Modified contract clauses, adding 52.222-90 (DEI Discrimination) and updating 52.244-6 (Subcontracts for Commercial Products and Services).

People

Points of Contact

Zelda J. WilliamsSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: May 5, 2026
Version 5
Solicitation
Posted: Apr 30, 2026
View
Version 4
Solicitation
Posted: Apr 22, 2026
View
Version 3
Solicitation
Posted: Apr 15, 2026
View
Version 2
Solicitation
Posted: Apr 7, 2026
View
Version 1
Solicitation
Posted: Apr 2, 2026
View