Electrical Upgrade to the Telephone Rooms for Backbone Upgrade

SOL #: 69056726Q000010Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Vancouver, WA

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electric Wire, And Power And Distribution Equipment (N061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 30, 2026
2
Last Updated
Feb 11, 2026
3
Submission Deadline
Feb 24, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Transportation, Federal Highway Administration (FHWA), Western Federal Lands Highway Division, has issued a Request for Quotation (RFQ) for an Electrical Upgrade to the Telephone Rooms for Backbone Upgrade in Vancouver, WA. This is a Total Small Business Set-Aside for a Firm Fixed Price (FFP) contract. The anticipated award date is February 26, 2026.

Scope of Work

The project requires the installation of dedicated UPS-backed electrical circuits from Panel UPS1A to specific Telecommunications Rooms (TRs) including NOC, Alaska TR, Denali TR, and Annex TR. Each TR needs two (2) new 30A/230V circuits terminated in twist-lock L6-30R receptacles. The work involves conduit installation, circuit wiring, breaker installation, receptacle installation, grounding and bonding (per NEC 250, internal to MC cable), and testing. A site survey and planning phase are required to assess breaker space, amperage, UPS load, and routing. Deliverables include a testing and commissioning report, and as-built drawings for cable routing.

Contract Details

  • Contract Type: Firm Fixed Price (FFP) Purchase Order
  • Period of Performance: To be completed no later than thirty (30) days after receipt of the order.
  • Set-Aside: Total Small Business Set-Aside
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors)
  • Size Standard: $19 million
  • Product Service Code: N061 (Installation Of Equipment: Electric Wire, And Power And Distribution Equipment)

Submission & Evaluation

Quotations must be submitted electronically by February 24, 2026, at 2:00 PM PT. Questions concerning the RFQ must be submitted in writing to WFL.Purchasing@dot.gov by February 23, 2026, at 4:00 PM PT. Evaluation factors include Price, Technical Compliance, Relevant Past Experience (using Attachment 0002), and Relevant Past Performance (using Attachment 0003). Award will be made to the responsible Offeror with the lowest evaluated price among technically acceptable quotations.

Key Dates & Contacts

  • Quote Due Date: February 24, 2026, 2:00 PM PT
  • Questions Due Date: February 23, 2026, 4:00 PM PT
  • Site Visit: Tuesday, February 10, 2026, at 1:00 PM PT in Vancouver, WA. RSVP to WFL.Purchasing@dot.gov. Compliance with the REAL ID Act is required for facility access.
  • Primary Contact: WFL Simplified Acquisition (WFL.Purchasing@dot.gov, 360-619-7733)

Important Notes

Offerors must have an active registration in the System for Award Management (SAM). A Wage Determination (No. 2015-5563, Revision No. 27) is applicable, outlining minimum wage rates and fringe benefits for the specified geographic area (Oregon and Washington counties). Recent Q&A (posted Feb 5, 2026) clarified that L6-30R receptacles (230V) are required, overriding earlier drawing specifications.

People

Points of Contact

WFL Simplified AcquisitionPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 1
Solicitation
Posted: Jan 30, 2026
View