EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL

SOL #: W912QR25BA005Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

Vermilion, IL

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2025
2
Last Updated
Feb 19, 2025
3
Submission Deadline
Feb 20, 2025, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 7
Solicitation
Posted: Feb 19, 2025
View
Version 6
Solicitation
Posted: Feb 19, 2025
View
Version 5Viewing
Solicitation
Posted: Feb 14, 2025
Version 4
Solicitation
Posted: Feb 5, 2025
View
Version 3
Solicitation
Posted: Jan 27, 2025
View
Version 2
Solicitation
Posted: Jan 16, 2025
View
Version 1
Solicitation
Posted: Jan 15, 2025
View