EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL
SOL #: W912QR25BA005Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States
Place of Performance
Vermilion, IL
NAICS
Other Heavy and Civil Engineering Construction (237990)
PSC
Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jan 15, 2025
2
Last Updated
Feb 19, 2025
3
Submission Deadline
Feb 20, 2025, 3:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap.
People
Points of Contact
Adyson MedleyPRIMARY
Richard VANDELINDESECONDARY
Files
Versions
Version 7
Solicitation
Posted: Feb 19, 2025
Version 6Viewing
Solicitation
Posted: Feb 19, 2025
Version 5
Solicitation
Posted: Feb 14, 2025
Version 4
Solicitation
Posted: Feb 5, 2025
Version 3
Solicitation
Posted: Jan 27, 2025
Version 2
Solicitation
Posted: Jan 16, 2025
Version 1
Solicitation
Posted: Jan 15, 2025