F-16 MMC Mounting Base, Electric, 8EA FMS

SOL #: FA8212-25-Q-0017Solicitation

Overview

Buyer

HILL AFB, UT, 84056, United States

Place of Performance

Place of performance not available

NAICS

Current-Carrying Wiring Device Manufacturing (335931)

PSC

Electrical Hardware And Supplies (5975)

Set Aside

No set aside specified

Timeline

1
Posted
Jul 21, 2025
2
Last Updated
Feb 3, 2026
3
Submission Deadline
Jan 21, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for the procurement of eight (8) Electric Mounting Bases for the F-16 Modular Mission Computer (MMC). This requirement supports Foreign Military Sales (FMS) for Bulgaria and Taiwan. The solicitation has been amended multiple times to extend the deadline, update quality requirements, and include IUID marking. Quotes are now due February 5, 2026.

Scope of Work

The contractor shall manufacture and deliver the Mounting Base, Electric (NSN: 5975-01-388-0808 WF).

  • Quantity: 8 units (Production articles for Bulgaria and Taiwan).
  • Technical Requirements: Items must interface with the MMC chassis and aircraft cooling systems.
  • First Article Testing (FAT): Required for new manufacturers; however, a waiver may be granted if the manufacturer has produced the NSN within the last three years.
  • Marking: Item Unique Identification (IUID) is required for all units per Amendment 0003.
  • Packaging: Must comply with military packaging standards (MIL-STD-2073-1 and MIL-STD-129) and international wood packaging regulations (ISPM 15).

Contract & Timeline

  • Type: Firm-Fixed Price (FFP) Single Award.
  • Set-Aside: None (Full & Open Competition).
  • Delivery Date: No later than December 31, 2028.
  • Response Due: February 5, 2026, at 3:00 PM MST.
  • CMMC Requirement: Level II (Self) certification is required prior to award.

Evaluation & Eligibility

Award will be made on an "All or None" basis. Bidders must provide proof of financial capability. Access to the Technical Data Package (TDP) is restricted; bidders must have an active DD Form 2345 (Military Critical Technical Data Agreement) to request export-controlled drawings.

Additional Notes

Amendment 0006 removed the requirement for ISO 9001:2015/AS9100 certification, reverting the quality requirement to Standard Inspection. This is a "DO" rated order under the Defense Priorities and Allocation System (DPAS).

People

Points of Contact

Brandon MosesSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 10
Solicitation
Posted: Feb 3, 2026
View
Version 9
Solicitation
Posted: Jan 28, 2026
View
Version 8
Solicitation
Posted: Jan 22, 2026
View
Version 7Viewing
Solicitation
Posted: Dec 29, 2025
Version 6
Solicitation
Posted: Dec 11, 2025
View
Version 5
Solicitation
Posted: Dec 11, 2025
View
Version 4
Solicitation
Posted: Dec 8, 2025
View
Version 3
Solicitation
Posted: Nov 24, 2025
View
Version 2
Solicitation
Posted: Nov 10, 2025
View
Version 1
Sources Sought
Posted: Jul 21, 2025
View