F-16 Panel, Power Distrib

SOL #: SPRHA4-26-R-0171Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT OGDEN, UT
HILL AIR FORCE BASE, UT, 84056-5820, United States

Place of Performance

Place of performance not available

NAICS

Motor and Generator Manufacturing (335312)

PSC

Electrical Control Equipment (6110)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 17, 2026
2
Last Updated
Apr 27, 2026
3
Submission Deadline
Apr 23, 2026, 5:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Aviation at Ogden, UT is soliciting proposals for F-16 Power Distribution Panels under a Firm Fixed-Price contract. This opportunity is a Total Small Business Set-Aside for the procurement of specific National Stock Numbers (NSNs) for the F-16 weapon system. Offers are due by April 23, 2026.

Scope of Work

This solicitation seeks to procure the following F-16 Power Distribution Panels:

  • 24 units of NSN: 6110-01-465-1082WF (P/N 16E2504-875)
  • 12 units of NSN: 6110-01-465-1078WF (P/N 16E3634-859)
  • 10 units of NSN: 6110-01-275-8549WF (P/N 16E2504-841) All items require Unique Identification (IUID). The Statement of Work (SOW) details requirements for preservation, packaging, and marking, adhering to various DoD and industry standards (e.g., MIL-STD-2073-1, MIL-STD-129).

Key Requirements

A critical requirement is that offerors must be fully qualified sources prior to contract award. The solicitation currently restricts awards to Interconnect Wiring, LLP; Polytronix, Inc.; and Richard Manufacturing Company. Other contractors wishing to bid must submit a qualification package. The Manufacturing Qualification Requirements (MQR) for each NSN detail:

  • Prequalification Notice: Notify the government of intent to qualify.
  • Capabilities: Certify and make available facilities, equipment, tooling, and personnel for manufacturing, inspection, testing, packaging, and storage.
  • Data Verification: Possess a complete data package, including drawings and specifications.
  • Process Verification: Manufacture items to ESA-approved engineering data, complying with UID requirements, and provide data on quality, performance, and environmental evaluations.
  • Test & Evaluation: Submit a qualification test plan for approval and a test report. Government inspection of testing is possible, requiring 30-60 days' advance notice.
  • Qualification Article: Provide a pre-contract award qualification article for form, fit, and function evaluation. Additionally, a Counterfeit Prevention Plan (CDRL A001) is required within 30 calendar days after contract award.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Solicitation Issue Date: March 9, 2026
  • Offers Due: April 23, 2026, 05:59 AM UTC
  • Contact: Kody Quayle (kody.quayle@us.af.mil)

Evaluation

Evaluation will primarily be based on Price or Cost, with other factors being "Significantly Less Important."

Additional Notes

Estimated costs for qualification range from $4,800 to $10,000 per NSN, with estimated completion times from 90 to 180 days. The award will not be delayed to allow vendors to meet qualification standards. Waivers for source qualification may be granted under specific criteria.

People

Points of Contact

Kody QuaylePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: Apr 27, 2026
View
Version 3Viewing
Solicitation
Posted: Apr 9, 2026
Version 2
Solicitation
Posted: Mar 9, 2026
View
Version 1
Sources Sought
Posted: Feb 17, 2026
View