F--NCR-NAMA: Hazard Tree Removal
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, has issued a Total Small Business Set-Aside Request for Quote (RFQ) for Hazard Tree Removal and Mitigation services at the National Mall and Memorial Parks. This opportunity involves the removal of 16 identified hazard trees, stump grinding, and site restoration. Quotes are due by May 27, 2026.
Scope of Work
The contractor will be responsible for the controlled and safe removal of 16 trees, disposal of all resulting debris off-site, complete grinding of associated stumps (24 inches below grade, including roots 1" diameter and larger), and backfilling stump holes with NAMA-approved topsoil. Specific soil requirements and a topsoil provider certificate are mandatory. An ISA Certified Arborist must be on-site during operations. The contractor is responsible for obtaining all necessary permits and adhering to ANSI and OSHA standards.
Contract Details
- Contract Type: Firm-Fixed Price Commercial Purchase Order.
- Product/Service Code: F014 (Tree Thinning Services).
- NAICS: 561730 ($9.5 million size standard).
- Period of Performance: June 1, 2026, to August 17, 2026.
- Place of Performance: Ash Woods, West Basin Dr., and Independence Ave. within the National Mall.
Submission & Evaluation
Quotes must be submitted via email to stephen_loftus@ios.doi.gov. Required documents include a completed checklist, signed SF1449 and amendments, completed provisions, a two-page project narrative, three prior project experiences (similar scope, past five years, with POC), a price schedule, and contractor core data. Offerors must be registered in SAM with an active UEI. Evaluation will be based on Best Value, considering Price, Project Narrative, and Prior Experience. Quotes will be evaluated in groups of three, starting with the lowest priced.
Important Notes
A site visit is not anticipated; vendors should utilize provided maps and photos. While this is not a new requirement, there is no current incumbent. Amendment 0005 provided contact information for government-provided topsoil sources. All references to "proposal" should be understood as "quotation." Payments will be processed electronically through IPP.