FA557026R0001 - Security Fencing, RAF Barford St John
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Air Force has issued Solicitation FA557026R0001 for a design/build project to install Security Fencing with an access gate at RAF Barford St John. This opportunity includes an optional line item for the removal of existing fencing. Proposals are due April 29, 2026, at 2:00 PM.
Scope of Work
This project requires the design and construction of a compliant security fence with an access gate. The fence must be 7-foot high, 9-gauge chain-link, topped with 3 strands of barbed wire (totaling 8 feet in height). All work must comply with United States Visiting Forces physical security requirements (UFC 4-022-03), current UK regulations, USAF Guidance, UK Building Standards, relevant US Standards (AFI's), CDM Regulations 2015, and JSP 375, adhering to the most onerous standard where conflicts exist.
An optional line item (1001) is included for the removal and disposal of approximately 1,765 linear feet of existing security fence. Contractors are responsible for 100% design, site verification, and identifying necessary surveys.
Contract Details
- Type: Firm Fixed Price
- Product Service Code: 5660 (Fencing, Fences, Gates And Components)
- NAICS Code: 238990 (Size Standard: 100 Employees)
- Set-Aside: None specified (Open competition), with a Notice of Price Evaluation Preference for HUBZone Small Business Concerns.
- Performance Period: Work to commence within 14 calendar days of award and be completed within 180 calendar days.
- Bonds: Performance and Payment Bonds are required.
- Place of Performance: RAF Barford St John.
Special Requirements & Considerations
- Environmental: Avoid disturbing identified areas of environmental interest; no ground disturbance within marked exclusion zones. Awareness of potential ground contamination. Tree removal requires 2:1 replacement.
- Safety: Compliance with JSP 375; submission of method statements, plans, and RAMS 1 week prior to work.
- Security & Access: Base security, access pass, and base rules apply. Base security clearance applications require submission to DIO at least 6 months in advance for unescorted access.
- Permits: Dig permits (AF Form 103) require 3 weeks' notice; Hot Work Permits require 1 week's notice.
- Site Information: Site is remote, requiring provision for mobile welfare facilities.
- Coordination: Close coordination with 422 CES/CEN and DIO is mandatory.
Submission & Evaluation
- Proposal Due: April 29, 2026, at 2:00 PM (extended by Amendment 0001).
- Submission Method: Email proposals to lawrence.roman.gb@us.af.mil and james.downs.5.gb@us.af.mil.
- Evaluation: Award will be made on a "best value" basis, prioritizing the lowest price offeror with acceptable technical capability and satisfactory past performance.
- Technical: Evaluated as ACCEPTABLE/UNACCEPTABLE, requiring a Project Plan and Safety Plan.
- Past Performance: Evaluated as SATISFACTORY, requiring recent and relevant information (within 5 years) and two references.
- Eligibility: Offerors must be registered and have an active status in SAM.gov.
Points of Contact
- Primary: Lawrence Roman (lawrence.roman.gb@us.af.mil, 441480843925)
- Secondary: James Downs (james.downs.5.gb@us.af.mil, 3142683128)