FA557026R0001 - Security Fencing, RAF Barford St John

SOL #: FA557026R0001Solicitation

Overview

Buyer

APO, AE, 09470-5720, United States

Place of Performance

Place of performance not available

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Fencing, Fences, Gates And Components (5660)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 27, 2026
2
Submission Deadline
Apr 17, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Air Force has issued a Solicitation (FA557026R0001) for a design/build project to install Security Fencing with an access gate at RAF Barford St John. This project requires compliance with United States Visiting Forces physical security requirements, specifically UFC 4-022-03. Proposals are due April 17, 2026, at 2:00 p.m.

Scope of Work

The project entails the design and construction of approximately 2.64 miles of security fencing. This includes installing a 7-foot (2.1m) high, 9-gauge chain-link fence topped with three strands of barbed wire angled outward at 45°, resulting in a total height of 8 feet (2.4m), and a secondary access gate. All work must adhere to UFC 4-022-03, UK Building Standards, relevant US Standards (AFI's), CDM Regulations 2015, and JSP 375, with the most onerous standard taking precedence in case of conflict.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP) design/build.
  • Performance Period: Work must commence within 14 calendar days of award and be completed within 180 calendar days.
  • Response Date: April 17, 2026, at 2:00 p.m.
  • Published Date: March 27, 2026.
  • Site Visit: Scheduled for April 8, 2026, at 10:00 AM. Attendees must confirm participation by April 3, 2026, via email to lawrence.roman.gb@us.af.mil and james.downs.5.gb@us.af.mil.
  • Place of Performance: RAF Barford St John.

Evaluation & Submission

Award will be made on a "best value" basis, prioritizing the lowest price offeror with acceptable technical capability and satisfactory past performance. Proposals must be submitted in three parts:

  • Part I - Technical: Includes a Project Plan (narrative on adhering to requirements, intent, capability, timelines, objectives) and a Safety Plan.
  • Part II - Past Performance: Requires recent and relevant information (within the past 5 years) on similar contracts, including two references with no adverse findings. A "Satisfactory" rating is required.
  • Part III - Price: Must include the total price for labor, equipment, and materials.

Technical capability will be evaluated on an ACCEPTABLE/UNACCEPTABLE basis first, followed by past performance, and then price. Proposals are to be emailed to lawrence.roman.gb@us.af.mil and james.downs.5.gb@us.af.mil.

Special Requirements & Notes

  • Set-Aside: None specified. NAICS Code: 238990 (Fencing, Fences, Gates And Components) with a 100-employee size standard. A Notice of Price Evaluation Preference for HUBZone Small Business Concerns is included.
  • Eligibility: Offerors must be registered and have an active status in SAM.gov.
  • Base Access: Base security clearance applications for unescorted access must be submitted to DIO at least 6 months in advance. Entry Access List (EAL) approval can take 2+ months to process.
  • Environmental: Avoid disturbing identified environmental interest areas. Manage potential ground contamination. Tree removal requires agreement and a 2:1 replacement ratio.
  • Documentation: Required submissions include DIO Form 140, final construction O&M manuals, and as-built drawings in AutoCAD (.DWG) and PDF formats.
  • Permits: Dig permits (AF Form 103) require 3 weeks' notice; Hot Work Permits require 1 week's notice.
  • Site Verification: Contractors are responsible for site verification and identifying necessary surveys.
  • Welfare Facilities: Provision for mobile welfare facilities is required due to the remote site.
  • Contacts: Lawrence Roman (lawrence.roman.gb@us.af.mil, 441480843925) and James Downs (james.downs.5.gb@us.af.mil, 3142683128).
  • Performance and Payment Bonds are required.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Mar 27, 2026
FA557026R0001 - Security Fencing, RAF Barford St John | GovScope