FITTING,LUBRICATION

SOL #: N0010426QFB10Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Other Metal Valve and Pipe Fitting Manufacturing (332919)

PSC

Hose, Pipe, Tube, Lubrication, And Railing Fittings (4730)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 27, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is soliciting proposals for the manufacturing of FITTING,LUBRICATION components. This material is designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) for crucial shipboard systems, requiring stringent quality control to prevent catastrophic failure. This opportunity is a Total Small Business Set-Aside. Proposals are due by March 27, 2026.

Scope of Work

The contract requires the manufacturing of Fitting, Lubrication in accordance with SAE AS15004 Part Number AS15004-3, with specific amplifications and modifications. Key requirements include:

  • Thread Inspection: Adherence to FED-STD-H28 series or acceptable commercial equivalents (ASME B1 series).
  • Mercury Free: Components must be free of mercury and mercury-containing compounds.
  • Configuration Control: Strict maintenance of equipment baseline configuration, with all waivers, deviations, and Engineering Change Proposals (ECPs) requiring Government review and approval.
  • Quality System: Contractors must maintain a quality system compliant with ISO-9001 (or MIL-I-45208 as an alternate) and calibration system requirements of ISO-10012 or ANSI-Z540.3 (or MIL-STD-45662 as an alternate).
  • Traceability & Certification: Comprehensive material traceability to Objective Quality Evidence (OQE) per MIL-STD-792, and submission of a detailed Certificate of Compliance for all SPECIAL EMPHASIS material.
  • Government Quality Assurance: Government Quality Assurance (GQA) will be performed at the source, with DCMA QARs reviewing Non-Destructive Testing (NDT) procedures.

Contract & Timeline

  • Contract Type: Solicitation
  • Set-Aside: Total Small Business
  • Product Service Code: 4730 - Hose, Pipe, Tube, Lubrication, And Railing Fittings
  • Response Due: March 27, 2026, 8:30 PM UTC
  • Published Date: March 5, 2026, 11:18 AM UTC
  • Delivery Schedule: Certification data CDRLs 20 days prior to delivery; Portsmouth Naval Shipyard (PNSY) review/acceptance 18 working days after receipt; Final material delivery 186 days.

Submission & Quality Assurance

  • Certification Data: Must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment via Wide Area Work Flow (WAWF). No material is to be shipped before acceptance.
  • Inspection: Final inspection includes material sampling per ANSI/ASQ-Z1.4 (General Inspection Level II) or Statistical Process Control (SPC), and 100% inspection of OQE and certification test reports.
  • Electronic Contractor Data Submission (ECDS): The ECDS system (https://register.nslc.navy.mil/) is available for data submissions, questions, and waiver requests.
  • Packaging: MIL-STD 2073 packaging requirements apply.
  • Priority Rating: Any awarded contract will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS).

Contact Information

For inquiries, contact ASHTON.K.PERRY.CIV@US.NAVY.MIL (Phone: 7176057574).

People

Points of Contact

ASHTON.K.PERRY.CIV@US.NAVY.MILPRIMARY

Files

Files

View
View
View
View

Versions

Version 5
Solicitation
Posted: Mar 12, 2026
View
Version 4Viewing
Solicitation
Posted: Mar 5, 2026
Version 3
Solicitation
Posted: Feb 13, 2026
View
Version 2
Solicitation
Posted: Feb 6, 2026
View
Version 1
Solicitation
Posted: Dec 16, 2025
View
FITTING,LUBRICATION | GovScope