Flathead National Forest - Condon Bunkhouse Maintenance Repairs

SOL #: 1240LU26Q0007Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Condon, MT

NAICS

Finish Carpentry Contractors (238350)

PSC

Maintenance Of Other Administrative Facilities And Service Buildings (Z1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 5, 2026
2
Last Updated
Jan 27, 2026
3
Submission Deadline
Jan 29, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes for maintenance and repair services for the Condon Bunkhouse and a residence within the Flathead National Forest, Condon, MT. This Total Small Business Set-Aside opportunity involves repainting, flood repairs, and general maintenance. Quotes are due by January 29, 2026, at 4:00 PM MST.

Scope of Work

This project entails comprehensive maintenance, repainting, and repairs to floors, walls, and ceilings in two bunkhouses and one residence at the US Forest Service's Condon Work Center. Key tasks include:

  • Repainting and repairs to interior surfaces (walls, ceilings, doors, trim, windows, moldings, bulkheads, basement walls, bunkhouse basement floors).
  • Flood repairs to walls and floors in a bedroom and laundry room of the residence.
  • Basement wall and ceiling repair in the residence.
  • Scrubbing and cleaning wall surfaces to remove mildew, installing gypsum board, and installing linoleum flooring.
  • Screening, sanding, and sealing maple floors.
  • Painting exterior doors and door trim.
  • Compliance with Master Painters Institute (MPI) standards for paint selection and finish.
  • Contractors must assume lead-based paint in buildings constructed prior to 1978 and manage waste accordingly. Mold remediation is required in Residence #3's flooded area.

Contract Details

  • Contract Type: Firm Fixed Price (anticipated one award).
  • Estimated Magnitude: $100,000 to $250,000.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 238350 Finish Carpentry Contractors (Small Business Size Standard: $19 million).
  • Place of Performance: Condon Work Center, Condon, MT.
  • Performance Period: 60 calendar days from Notice to Proceed (NTP), with an approximate start in April 2026.
  • Wage Rate: General Decision Number: MT20250063 dated 12/12/2025 (Davis-Bacon Act).

Submission & Evaluation

  • Quotes Due: January 29, 2026, at 4:00 PM MST.
  • Submission Method: Email to lisa.rakich@usda.gov.
  • Required Documents: Schedule of Items with Prices, Past Performance Questionnaire, and Written Technical Approach.
  • Evaluation Factors: Experience (Past Performance), Technical Approach, and Price, based on a comparative evaluation for best value.
  • Pre-Quote Site Visit: Held on January 22, 2026, at 11:00 AM MST at the Condon Work Center.
  • Questions: Final Q&A's posted January 26, 2026.
  • Offerors must hold prices firm for 60 calendar days.

Key Clarifications

  • Painting preparation includes repairing drywall damage.
  • No replacement of door jambs or modified door trim is planned.
  • Asbestos-Containing Material (ACM) is not expected in Residence #3; testing showed no ACM.
  • Contractors are not required to perform electrical work but must install drywall around outlet boxes.

People

Points of Contact

Lisa RakichPRIMARY
Patrick SiersSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Jan 26, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 12, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 5, 2026
View