FLUID CHILLER

SOL #: W912CH25QA017Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC- DTA
WARREN, MI, 48397-5000, United States

Place of Performance

Place of performance not available

NAICS

Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing (333413)

PSC

Fans, Air Circulators, And Blower Equipment (4140)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 9, 2025
2
Last Updated
Jun 17, 2025
3
Submission Deadline
Jun 24, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

FLUID CHILLER:61,000 BTU?s / Hr Inlet /Outlet Piping needs to be 11/4? NPT. Pump Specifications must be 18 GMP at 38 PSI. Voltage / Phase must be 230/1, 230/3, 460/3Rated load amps at 11A@460/3. Dimensions must be 42?L X 28?W X 66?H. Dry Weight must be approximately 760 lbs. Chiller outlet temp should be 50 degrees Fahrenheit. Must have at least a 26-gallon reservoir. Chiller pump must be rated for no less than 5gpm. Pump must be continuous duty and of stainless-steel construction. All piping must be non-ferrous. Shall have a footprint no larger than 42? x 28? and less than 80? in height. Shall have a digital display for temperature display and control. Shall use R407c refrigerant. Shall have a highly efficient scroll compressor. Shall include at least a 1-year parts and labor warranty. Must be rated to operate outside all year.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jun 17, 2025
Version 1
Combined Synopsis/Solicitation
Posted: Jun 9, 2025
View
FLUID CHILLER | GovScope