Fort Simcoe Job Corps Center Water System Renovation
SOL #: 12441926R0002Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Forest Service
USDA FOREST SERVICE-SPOC EAST
Washington, DC, 202500001, United States
Place of Performance
White Swan, WA
NAICS
Water and Sewer Line and Related Structures Construction (237110)
PSC
Repair Or Alteration Of Schools (Z2CA)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Feb 10, 2026
2
Last Updated
Apr 15, 2026
3
Submission Deadline
Apr 20, 2026, 9:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting quotations for the Fort Simcoe Job Corps Center Water System Renovation project in White Swan, WA. This is a Combined Synopsis/Solicitation (RFQ) for a Total Small Business Set-Aside. The project involves significant upgrades to the potable water distribution system. Quotations are due April 20, 2026.
Scope of Work
This project entails the comprehensive renovation of the water system at the Fort Simcoe Job Corps Center. Key components include:
- Replacement of approximately 9,256 linear feet of 6-inch potable water pipe.
- Installation of new fire hydrants and backflow prevention valves.
- Instrumentation upgrades at existing wells and storage tanks.
- Associated civil works such as mobilization, erosion controls, utility locates, construction signage, water service replacements, pavement and sidewalk restoration, and asbestos cement pipe removal and disposal.
- Well, reservoir, and fill station improvements.
- Optional items include additional waterline construction, gate valves, and pavement restoration. Detailed technical specifications cover general requirements, selective demolition, cast-in-place concrete, comprehensive electrical systems (including SCADA, PLCs, instrumentation, and telemetry), earthwork, asphalt paving, site water utility distribution, and disinfection procedures.
Key Clarifications & Amendments
- Amendment 004 provided responses to questions.
- Amendment 003 extended the solicitation closing date and question period.
- SCADA System: Alternate SCADA systems are acceptable if they meet or exceed specified requirements. The contractor is responsible for providing a turn-key SCADA system, including programming and training. The standalone Historian license requirement has been eliminated, replaced by an integrated historian with a perpetual license and 1-year maintenance. New flow meters are required for all three wells.
- Rock Excavation: Excavation and backfill are incorporated into unit prices; no separate line item for rock excavation.
- Backfill Material: Screened native material is acceptable if it meets "select fill" specifications.
- Pricing Submission: Bidders must use Attachment 4 (PDF) for the Schedule of Items.
Contract Details
- Type: Firm-Fixed Price Construction Contract (RFQ)
- Set-Aside: Total Small Business Set-Aside (NAICS 237110, $45M size standard)
- Period of Performance: 180-day base period from Notice to Proceed; project completion within 365 days of award.
- Wage Rates: Davis-Bacon wage determinations (WA20260119) apply for Yakima County, Washington.
Submission & Evaluation
- Submission Method: Email quotations to Bradley.Martin2@usda.gov and Ian.Barnes@usda.gov.
- Evaluation Criteria: Lowest Price Technically Acceptable (LPTA).
- Evaluation Factors: Technical Approach (Project Schedule), Demonstrated Prior Experience, and Price Schedule, all of equal importance.
- Requirements: Offerors must have an active entity registration in SAM.gov and acknowledge all amendments. Prices must be held for 180 calendar days.
Important Dates
- Second Site Visit: Thursday, April 9, 2026, at 0900 Pacific Time (Location: 40 Abella Lane, White Swan, WA 98952).
- Questions Due: April 14, 2026, 1200 Eastern Time.
- Quotations Due: April 20, 2026, 1700 Eastern Time.
People
Points of Contact
Bradley MartinPRIMARY
Ian BarnesSECONDARY
Files
Versions
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 30, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
Version 1
Pre-Solicitation
Posted: Feb 10, 2026